Seeking for a challenging position as a Mechanical
Engineer in a leading Oil & Gas, Power Plant, or Construction
Company in the Engineering or Project Controls&Management field
Professional Experience
1- From 1/8/2008 until Now:- Company: Power Generation Engineering and Services Company (PGESCo) Scope of Work:Engineering and Consulting for El-Kureimat III 750 MW Combined Cycle Power plant Location:El-Kureimat-Giza-Egypt. Owner:Upper Egypt Electricity Production Company (UEEPC). Job Description: Assistant Manager Startup & Operation. Plant Description:Combined cycle consisting of 2x250 MW Natural Gas/Light Oil Fired Gas Turbines (G.E MS9001 FA),2HRSG (CMI/Initec), 1x250 MW Steam Turbine (ALSTOM) with all associated auxiliaries 2- From 1/3/2007 to 31/7/2008:- Company:Power Generation Engineering and Services Company (PGESCo) Scope of Work:Engineering and Consulting for El-Kureimat 2* 750 MW Combined Cycle Power plant Location:El-Kureimat-Giza-Egypt. Owner: Upper Egypt Electricity Production Company (UEEPC). Job Description: Commissioning, Startup&Operation Advisor Engineer. Plant Description:Phase 1:Combined cycle consisting of 2x250 MW Natural Gas/Light Oil Fired Gas Turbines (Siemens SGT 5-4000 F (V94.3A2)), 2 HRSG (CMI/Skoda), 1x250 MW Steam Turbine (Hitachi) with all associated auxiliaries and Water Treatment Plant. Phase 2:Combined cycle consisting of 2x250 MW Natural Gas/Light Oil Fired Gas Turbines (G.E MS9001 FA), 2 HRSG (CMI/Initec), 1x250 MW Steam Turbine (ALSTOM) with all associated auxiliaries 3- From 1/9/2005 to 28/2/2007:- Company: Dubai Electricity & Water Authority (DEWA) Scope of Work:Operation of E-Station Power Plant consisting of 5 Gas Turbines,2 Steam Turbines, and 4 Desalination Plants. Location:Jebel Ali-Dubai-United Arab Emirates (U.A.E). Job Description:Senior Control Room Operator. Plant Description: Phase 1:Combined cycle consisting of 3x100 MW Gas Turbines (G.E), 3 Waste Heat Boilers (KHIC), 4 Desalination Plants (28 MIGD), 2 Auxiliary Boilers and 1x58 MW BPST. Phase 2: Combined cycle consisting of 2x110 MW Gas Turbines (G.E), 2 HRSG (Italian Combustion Engineering), and 1x112 MW Steam Turbine.
Eductation
B.Sc of Mechanical Power Engineerin Faculty of Engineering 2000 Grade :64.54%
Additional Information
4- From 21/7/2003 to 31/8/2005:- Company: Egyptian Operating and Maintenance Power Company (EOMPC) Scope of Work:Operating and Maintenance of El-Kureimat 2x627 MW Steam Power plant Location: El-Kureimat-Giza-Egypt. Owner: Upper Egypt Electricity Production Company (UEEPC). Job Description: Senior Control Room Operator. Plant Description: Thermal Power Plant consisting of 2x2063 Ton/Hr MCR Natural Gas/Heavy Oil Fired Steam Generators (Babcock&Wilcox), and 2x627 MW Steam Turbines (G.E 5- From 1/2/ 2003 to 20/7/2003:- Company:Misr Sons Development S.A.E (Hassan M. Allam Sons Co.) Location:Electro-Mechanical Erection Department Head Office-Cairo-Egypt. Job Description: Planning & Scheduling / Technical Office Engineer 6- From 1/1/2001 to 31/1/2003:- Company:Misr Sons Development S.A.E (Hassan M. Allam Sons Co.) Project:Alexandria Specialty Petroleum Products Company (ASPPC) Scope of Work: Mechanical Equipment and Piping Erection Location: El-Mex-Alexandria-Egypt. Owner: ASPPC Main Contractor: Tecnicas Reunidas (tr), Spain. Job Description: Mechanical/Piping Engineer