Participates in Ready for Pre-Commissioning(RFP) and Ready for Commissioning(RFC) walk-downs for process and utility systems. Designated as system owner in RFP/RFC walk-downs of specific process and utility systems. Final review of punches generated at RFP/RFC walk downs. Punch clearing of RFP/RFC piping related punches generated at both process and utility walk-downs. Responsible for final inspection of Pressure Safety Valves(PSV) and Strainers. Inspection/witnessing of pipe spring supports lock releasing and cold setting activity. Review of Pressure Test Packages for hydrotesting All inspection/reviews are based on Shells DEP Standard, Project Specification and other relevant piping engineering standards. Attend technical and coordination meetings with the main contractor.