2009(May) ¡V Present: Sr. Field Support Engineer Rockwell Automation Southeast Asia Pte. Ltd. Responsible for: „X Service customer at working site about PLC Allen ¡V Bradley „X Conduct training for customer „X Execute project for modification control system „X Etc.
„X Execute automation projects „X Programming PLC for automation projects, „X Re-locate machines „X Commissioning / Test run and transfer to production „X Established SCADA system for production line „X Launch improvement projects „X Established maintenance document/ instruction manual for maintenance team „X Training for production and maintenance team
1998-2008: Sr. Project Engineer, Philips Electronics (Thailand) Responsible for: „X Design control system/ schematic diagram/ fabricate control cabinet/ install „X Programming PLC / HMI software to control machine and test run „X Cooperate with process/production engineer for machine improvement and transfer „X Manage and advice subordinate to execute project and problem solving also continuous improvement by using MEDIC approach „X Manage factory CAPEX, Setup yearly CAPEX for factory, feasibility study project calculate payback period make a proposal to get approve of investment. Monitor and control actual spending of CAPEX
„X Planning and execute the project, from MS1 to MS3. Cooperate with supplier for installation works also prepared for purchasing parts. Solving the problem to make the project success then transfer to production and maintenance team. Training to technician and do the documentation
„X Make the monthly report to Engineering manager
Eductation
Education Background Vocational, Ubonratchathani Technical College 1987-1990 Ubonratchathani province Major of Electronics GPA 2.99 Diploma, Rajamanggara Institute of technology northeastern campus 1990-1992 Nakornratchasima province Major of Electronics GPA 3.13 Bachelor degree, King Mongkut Institute of Technology Ladkrababg 1994-1996 Bangkok Major Instrumentation Engineering GPA 2.58
Certification
Highlight, accomplish „XIncrease CMK of coating weight from 0.68 to 1.68 „XModify machine to solving uncompleted dry coated tube „XRe-locate machine from Holland to increase productivity „XS7-project, to replace old controller to increase machine efficiency (project cost 18 million Baht) „XModify coating machine from butyl to water base for cost reduction (project cost 7 million Baht) „XEtc.
Dismantle coating machine at Holland for 2 weeks to move to Thailand Install cutting machine in China for 2 weeks S7-Project conversion HTL3003 at Holland for 2 weeks S7-Project conversion HTL3001 at Holland for 2 weeks S7-workshop at Indonesia for 1 week QIC competition at Malaysia for 1 week QIC competition at Vietnam for 1 week QIC competition at South Africa for 1 week