1-TCI SANMAR GROUP: PVC Project
[Feb 2003-Aug 2009]
2-Centamin gold mine Sukari gold project [First Gold Mine in Egypt]
[Aug 2009-Sep 2010]
3- BIRLA group: Alexandria Carbon Black petrochemical Company
[Sep 2010-Till now]
Professional Experience
Cold commissioning:
-list the commissioning pre-requisites for this system and inspection and test plan for documents equipments and control system check -create the summary check list, system item list, contingencies, detailed check list for equipments and control loop -All ancillary equipment, instrument loops, interlocks, process controls and sequence logic have utilized and checked under production condition
Cold commissioning of different circuits comprised of: .Receipt of hand over documentation from construction .confirmation that all equipment, instrumentation and controls are installed and operational .tests of emergency stop .operation of each stage with control from instrumentation, testing for Vibration if possible Noise if possible [Deleted if obvious noise is not excessive] Equipment operating temperatures Operation of system as a unit Write start up and shutdown procedure
Plant Process chemist – Crushing Circuit Plant Process chemist – Grinding Circuit Plant Process chemist – CIL Circuit
Process Section: 1. Startup & shutdown Procedure for the plant. 2. operating of all rotating equipment like (pumps, fan, compressor and blowers). 3. Planned Maintenance for all Equipments by using check lists. 4. Operating Furnace reactor (thermal cracking of Petroleum Oil which Produce Carbon). 5. Operating Elevators Palletizes, Mixers, Accumulators. 6. Preparation of Oil batches & blends. 7. Adjustment of quality as per ASTM (American Society of Testing & materials).
Eductation
BSC. Science, Alexandria University, May 2001, Chemistry
Certification
Diploma in petrochemical, Alexandria University, 2009