All applicable documents are checked. Correct methods are applied in cutting and machining. Dimensional accuracy must be checked. NDT report is assessed. Material control / Identification and test certification. Making incoming material verification report. Welding consumable control and verification certificate. Fit-up inspection which includes weld joint preparation, dimension and alignment. Fit-up Inspection, welding inspection before, during and after welding Ensure / Control all NDT works are strictly adhered to procedures. Maintaining inspection reports, records and summary. Tracking and recording welder’s performance based on NDT reports. Responsibility to welding Inspection for Boiler & pressure vessel. Co-ordinating NDT activities, preparing and updating daily NDT and repair status Preparing daily welder performance status. To allocate Man Power for site works.