|
|
|
Source: www.gulfoilandgas.com 5/8/2012, Location: Africa
|
|
|
|
Rialto Energy Limited, provides the following weekly update on drilling operations at the Gazelle-P3 ST Well. The Gazelle-P3 ST well was spudded on 12 March 2012 using the Transocean GSF Monitor jack-up drilling rig. The well is the first of an overall three well drilling programme on CI-202 that is anticipated to take six months to complete, together with testing.
Since the last report, the well has been drilled to a depth of 2181m MDRT (1847m TVDSS). Rialto is expecting to drill and wireline log the Upper Cenomanian reservoir section during this week.
|
|
|
|
|
| HRT Announces Results of Wingat Well |
|
Namibia >> 5/20/2013 - HRT Participaçoes em Petroleo S.A through its wholly-owned subsidiary HRT Walvis Petroleum (Proprietary) Ltd. ("HRT Walvis"), announces that its first...
|
|
|
|

|
|
|
More News
Related Links
Countries Quick Links
|