Mooring Systems: News for Oil & Gas and Hydrocarbon Industries  Membership Services »
Gulf Oil and Gas grow your business
Home News Events Projects Tenders Unconventionals Community | My Account Gulfoilandgas rss feed Follow us on Facebook  Jobs 
Products and vendors Services and providers Oil & Gas Software and publications

First Subsea Completes Block 31 FPSO Deepwater Mooring

Source: www.gulfoilandgas.com 5/29/2012, Location: Africa

Share |

Subsea mooring connector specialist, First Subsea, has successfully completed the mooring of the PSVM (Plutao, Saturno, Venus and Marte) FPSO in 2,000 meters (6,562 feet) of water, in the BP Block 31 ultra deepwater development, offshore Angola.

The external turret-moored FPSO has 12 mooring lines, each with a Ballgrab Series I ball and taper subsea mooring connector, with a minimum breaking load (MBL) of 4,903kN. The female receptacle part of the Ballgrab connectors was installed subsea, mounted on docking porches on suction piles, ahead of the arrival of the PSVM FPSO. Once the production vessel was on-station, the mooring connector attached to the mooring line was lowered into the receptacle to complete the installation. The process was then repeated until all 12 mooring lines were connected.

Chris Newlands, mooring project manager, SOFEC Inc, commented: "The First Subsea team did a great job. The moorings went very smoothly; we were kept informed at every stage, ensuring each mooring was completed without a hitch."

The double-hulled PSVM FPSO is a hub field development that will produce oil from the Plutao, Saturno, Venus and Marte fields. Comprising the northeast sector of the license about 400 kilometers (249 miles) from Luanda, PSVM is the first of four planned development projects on Block 31.

Mooring Systems News in Angola >>

QPI and Total Seal a Strategic Partnership in Congo
Congo >>  5/22/2013 - Qatar Petroleum International (QPI) and Total are pleased to announce the signing of a framework of Agreement whereby QPI will participate in Total E&...
Chariot Extends First Renewal Phase, Offshore Namibia
Namibia >>  5/22/2013 - Chariot Oil & Gas has announced that the Ministry of Mines and Energy in Namibia has granted a one year extension for the First Renewal Phase on the C...

Oceaneering Announces Burullus Phase IXa Contract
Egypt >>  5/20/2013 - Oceaneering International, Inc. announced that it has secured a contract from Saipem to supply umbilicals for the Burullus West Delta Deep Marine Phas...
Launching the 4th Tanzania Bidding Round in October 2013
Tanzania >>  5/19/2013 - The Government of the United Republic of Tanzania through Tanzania Petroleum Development Corporation (TPDC) is pleased to announce the 4th Tanzania De...

Total Buys Shell's Retail Network in Egypt
Egypt >>  5/15/2013 - French oil company Total SA Wednesday confirmed it acquired Royal Dutch Shell PLC's fuel retail network in Egypt as part of its strategy to strengthen...
Mashreq to Build Fuel Terminal on the Suez Canal
Egypt >>  5/13/2013 - Citadel Capital, the leading investment company in Africa and the Middle East, announced today that core platform company Mashreq Petroleum has signed...



Related Categories: Diving Contractors  Dredging  FPSO Vessels and Equipment  General  Marine Services  Mooring Systems  Offshore Platforms  Subsea Production 

Related Articles: Diving Contractors  Dredging  FPSO Vessels and Equipment  General  Marine Services  Mooring Systems  Offshore Platforms  Subsea Production 


Angola Oil & Gas 1 >>  2 | 3 | 4 | 5 |


More News

Oil & Gas Projects in Angola >>

Oil & Gas Companies in Angola >>

Related Links

Countries Quick Links

AO CD CG CI CM DZ EG ET GA GH GN GQ KE LR LY MA MG ML MR MZ NA NE NG SD SL SN SO TD TN TZ UG ZA
Gulf Oil and Gas E-Marketplace - Promote your Business - About Us
Copyright © Universal Solutions All rights reserved. Privacy Policy. - Contact Us