Drilling: News for Oil & Gas and Hydrocarbon Industries  Membership Services »
Gulf Oil and Gas grow your business
Home News Events Projects Tenders Unconventionals Community | My Account Gulfoilandgas rss feed Follow us on Facebook  Jobs 
Products and vendors Services and providers Oil & Gas Software and publications

Gulf Keystone Completed the Shaikan-5 Well Drilling

Source: www.gulfoilandgas.com 6/26/2012, Location: Middle East

Share |

Gulf Keystone provides an update on its ongoing appraisal programme at the Shaikan block in the Kurdistan Region of Iraq, which is a major discovery with independently audited gross oil-in-place volumes of between 8 billion barrels to 13.4 billion barrels calculated on the P90 to P10 basis, with a mean value of 10.5 billion barrels.

The Company has completed the drilling operations of the Shaikan-5 appraisal well, drilled 6 km to the northeast of the Shaikan-2 appraisal well. Shaikan-5 is the fourth well in the five-well appraisal programme, which has been drilled to evaluate the eastern culmination of the Shaikan structure. In May 2012, the well reached a total depth of 3,750 metres in the Kurre Chine Dolomite formation in the Triassic, which is the deepest horizon drilled by a Shaikan well to date.

Extensive logs and core acquired during the Shaikan-5 drilling operations have further enhanced the Company's understanding of the reservoir and its fracture system. Results obtained in the Jurassic interval indicated a continuous oil column with approximately 237 metres of net pay, and porosities, which are consistent with results, obtained elsewhere in the field, most recently with the Shaikan-4 appraisal well. Good hydrocarbon saturations were calculated throughout the Jurassic interval where fracture intensity appears to be comparable to or exceed those seen in other Shaikan wells. Oil shows were also recorded whilst drilling in the Triassic formation.

Work is underway to evaluate these preliminary results, and further testing of the prolific Jurassic reservoir and the Triassic interval is being considered once a work-over rig is available to move to the Shaikan-5 location. Following the completion of the well testing programme, Shaikan-5 will be completed as a Jurassic producer and tied to the Company's second Extended Well Test facility (EWT-2), which is currently under construction.

John Gerstenlauer, Gulf Keystone's Chief Operating Officer commented: "These solid preliminary results obtained with the Shaikan-5 appraisal well confirm the massively prolific nature of the Jurassic interval of the Shaikan structure. We look forward to completing the Shaikan appraisal programme, including further testing of the Jurassic and Triassic intervals with the Shaikan-5 and -6 wells, and incorporating all the new results into our independently audited gross oil-in-place estimates for the world-class Shaikan discovery. Deeper potential of the Triassic and Permian horizons will be tested with the Shaikan-7 exploration well in 2013."

Drilling News in Iraq >>

RIL, BP & NIKO Discover Significant Gas Condensate in India
India >>  5/24/2013 - Reliance Industries Limited (RIL) and its partners BP and NIKO announced a significant gas and condensate discovery in the KG D6 block off the eastern...
Petrobras Completes Drilling & Testing of Florim Well
Brazil >>  5/23/2013 - We have completed the drilling and formation testing of the oil discovery well in the Assignment of Rights area denominated as Florim, in the Santos B...

WesternZagros Starts Garmian Drilling Program
Iraq >>  5/21/2013 - WesternZagros Resources Ltd. (WZR) (WesternZagros) has started its latest Garmian Block drilling program in the Kurdistan Region of Iraq. The Mil Qasi...
Kosmos Announces Results from Sipo-1 Exploration Well
Cameroon >>  5/20/2013 - Kosmos Energy Ltd announced results from the Sipo-1 exploration well onshore Cameroon. Drilled on the Ndian River Block in the Rio del Rey Basin, the ...

Spudding of the 4th Well of Phase of Kharsang Field
India >>  5/20/2013 - Jubilant is pleased to announce that KPL-3E-2, the fourth well of the six well Phase-III-Extension development drilling campaign in the oil producing ...
Marine-1 Drilling Rig to Start Operations in SP Phase 20
Iran >>  5/20/2013 - Marine-1 drilling rig is set to start drilling 12 wells in phase 20 of the South Pars gas field after completing its operations in the oil layer of th...



Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Iraq Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 |



More News

Oil & Gas Projects in Iraq >>

Oil & Gas Companies in Iraq >>

Related Links

Countries Quick Links

AE BH IL IQ JO KW LB OM QA SA SY YE
Gulf Oil and Gas E-Marketplace - Promote your Business - About Us
Copyright © Universal Solutions All rights reserved. Privacy Policy. - Contact Us