Gulf Oil and Gas accountACCOUNT

DNO finds More oil in Nabrajah-3

Source: www.gulfoilandgas.com 11/23/2004, Location: Middle East

Share |
The test in the upper Qishn S1 sandstone in Nabrajah-3 in Yemen produced 725 barrels of oil per day. This is the first test at this reservoir level at Nabrajah and the results are encouraging.

Based on the results from electrical logs, which indicated oil also in the shallower Qishn S1 level between 1.670 and 1.676 meters, it was decided to perform a production test at this level. A maximum oil rate of 725 barrels of oil per day was produced during the test. Some 3.700 barrels of water per day were also produced.

The main reservoir at Nabrajah is the upper Qishn S2 sandstone, and all three wells drilled at Nabrajah have encountered oil at this level. As reported in the Stock Exchange Notice dated 16 November 2004, the test in the Upper Qishn S2 sandstone in Nabrajah-3 produced ca. 2.200 barrels of oil per day

The test in the Upper Qishn S1 sandstone was conducted in the interval between 1670 - 1676 meters. This is the first test in the upper Qishn S1 sandstone at Nabrajah and the fact that moveable oil was confirmed at this level is encouraging.


Drilling News in Yemen >>

Indonesia >>  10/16/2017 - JV partner Lion Energy reports that the South Block A PSC joint venture (Lion equity share: 40.7%) has formally approved drilling of the AMT-2 well to...
United Kingdom >>  10/13/2017 - Angus Energy has successfully completed the drilling of the Lidsey-X2 production well. The Company will produce from a “net oil pay” section of 443 me...

Singapore >>  10/12/2017 - AkerBP has received consent to use Maersk Interceptor on the Tambar field for drilling and completion of wells 1/3-K-4 and 1/3-K-2.

...

Thailand >>  10/11/2017 - Tap Oil Limited provides the following update on the Manora Oil Field in the Northern Gulf of Thailand (TAP 30% interest). Mubadala Petroleum, Operato...

Malaysia >>  10/10/2017 - Semi-submersible Maersk Deliverer has been awarded a new contract by JX Nippon with an estimated duration of 30 days. The contract covers the drilling...
Norway >>  10/9/2017 - Statoil Petroleum AS, operator of production licence 718, has completed the drilling of wildcat well 7317/9-1. The well is dry. The well was drilled a...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Yemen Oil & Gas 1 >>  2 | 3 | 4 | 5 |

Oil & Gas Projects in Yemen >>

More News

 

Oil & Gas Companies in Yemen >>


Related Links

AE BH IL IQ JO KW LB OM QA SA SY YE
Gulf Oil and Gas
Copyright © Universal Solutions All rights reserved. - Privacy Policy.