Gulf Oil and Gas accountACCOUNT

AuDAX Completes Lambouka 3D Seismic Interpretation

Source: www.gulfoilandgas.com 5/12/2010, Location: Africa

Share |
AuDAX Resources Ltd is pleased to announce that the interpretation of the Sicily Channel 3D seismic fast track cube over the Lambouka prospect has been completed ahead of schedule. The objective of the fast track 3D cube was to optimize the drilling location for the upcoming Lambouka-1 well.

The acquisition of the 3D seismic fast track cube over the Lambouka prospect was completed on the 1st of April 2010 and processing of the data was completed on the 2nd of May 2010. Interpretation of the new 3D seismic data has confirmed a drilling location within the originally envisaged area in Tunisian waters based on the previous 2D seismic data set.

In addition to confirming an optimal drilling location the new 3D seismic data set has confirmed the structural validity of the Lambouka prospect as well as further resource upside potential. Excellent seismic reflectivity is present at various hydrocarbon target levels not seen previously on the 2D data which is interpreted by AuDAX as evidence of the presence of good reservoir.

In addition to Lambouka another large sized prospect north of the Dougga field has been identified on seismic. It is expected that the fully processed Geostreamer 3D data (approx. 640 km2) will identify further drillable prospects and contribute to enhancement of their prospectivity. The expected spud date for the Lambouka-1 exploration well is during the week commencing the 14th of June 2010.

Seismic survey News in Tunisia >>

United States >>  8/17/2018 - Seabed Geosolutions has secured an extension to recently awarded 4D ocean bottom node (OBN) seismic monitoring surveys over multiple oil and gas field...
Jamaica >>  8/13/2018 - United Oil & Gas Plc, the London Stock Exchange listed oil and gas exploration and development company, has announced that the fast track version of t...

United Arab Emirates >>  8/10/2018 - Polarcus Limited has received an award for a 3D marine seismic acquisition project in West Africa. The project duration is approximately three months ...
Australia >>  8/8/2018 - TGS announces that the purchase of the Capreolus 3D seismic survey from Polarcus has been completed. The Capreolus, full broadband 3D seismic survey i...

Canada >>  8/2/2018 - TGS announces West of Shetlands project. Acquisition has commenced on the new Erlend Wild West multi-client 3D seismic project. This survey will cove...
United States >>  8/2/2018 - TGS announces expansion of two 2018 onshore seismic surveys, Gloss Mountain 3D and Canton 3D, targeting the high potential Mississippian Chester, Osag...

Related Categories: Formation Evaluation  General  Geological, Geophysical  Geophysical Contractors  Mud Logging  Reservoir Engineering & Recovery Methods  Seismic survey  Well Completion, Logging, Workover 

Related Articles: Formation Evaluation  General  Geological, Geophysical  Geophysical Contractors  Mud Logging  Reservoir Engineering & Recovery Methods  Seismic survey  Well Completion, Logging, Workover 


Tunisia Oil & Gas 1 >>  2 | 3 | 4 | 5 |

Oil & Gas Projects in Tunisia >>

More News

 

Oil & Gas Companies in Tunisia >>


Related Links

AO BJ BW CD CG CI CM DZ EG ET GA GH GM GN GQ GW KE LR LY MA MG ML MR MZ NA NE NG RW SC SD SL SN SO ST SZ TD TN TZ UG ZA ZM
Gulf Oil and Gas
Copyright Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.