Gulf Oil and Gas accountACCOUNT

Audax Provides Operational Update on Lambouka-1 Well

Source: www.gulfoilandgas.com 7/27/2010, Location: Africa

Share |
Following the resolution of rig power supply issues reported in the previous update, a final wiper trip of 26" hole was conducted, then 20” casing was run and cemented to a depth of 922m. All rig anchors were successfully tested to full storm tension compliance.

Following the running of BOPs and the Sub Sea Riser to a 610m water depth weather conditions deteriorated and rig operations were suspended. Waited for weather conditions to improve for approximately 48 hours, work continued to run BOPs on riser.

Weekly Operations Forecast:
Forecast operations during the coming week are as follows:
• Latch BOPs to wellhead and pressure test BOP and connector
• Drill 16’’ hole to approximately 1,340 meters MD
• Run and Cement 13 3/8” casing

Participants in the Lambouka -1 well are as follows:
ADX 30% Operator
Gulfsands Petroleum Plc 30%
Carnavale Resources Ltd 20%
XState Resources Limited 10%
PharmAust Limited 10%

Casing, Tubing & Drill Pipes >>

Casing, Tubing & Drill Pipes News in Tunisia >>

Egypt >>  2/19/2018 - Noble Energy, Inc. has signed agreements to sell significant quantities of natural gas from the Leviathan and Tamar fields to Dolphinus Holdings Limit...
Egypt >>  2/14/2018 - C-Kore Systems closed off an excellent 2017 with an installation/commissioning campaign for the Egyptian Atoll project in collaboration with Subsea 7’...

Egypt >>  2/12/2018 - BP announced the start of gas production from the Atoll Phase One project, offshore Egypt. The project, in the North Damietta concession in the East N...
Egypt >>  2/2/2018 - Petroleum Minister Tareq el Molla discussed in a meeting with CEO of Kuwait Petroleum Corporation (KPC) Nizar Mohammad Al Adsani ways of boosting bila...

Egypt >>  1/29/2018 - Yokogawa Electric Corporation announces that its subsidiary, Yokogawa Middle East & Africa B.S.C.(c), has received an order from the state-owned Egypt...

Related Categories: Blowout Preventers Ram, Rotary, Spherical & Annular  Casing, Tubing & Drill Pipes  Coiled Tubing  Drill Bits and Cutters  Extraction Equipment  General  Handling Tools  Hoisting Systems  Lubricating Equipment 

Related Articles: Blowout Preventers Ram, Rotary, Spherical & Annular  Casing, Tubing & Drill Pipes  Coiled Tubing  Drill Bits and Cutters  Extraction Equipment  General  Handling Tools  Lubricating Equipment 


Tunisia Oil & Gas 1 >>  2 | 3 | 4 | 5 |

Oil & Gas Projects in Tunisia >>

More News

 

Oil & Gas Companies in Tunisia >>


Related Links

AO BJ BW CD CG CI CM DZ EG ET GA GH GM GN GQ GW KE LR LY MA MG ML MR MZ NA NE NG RW SC SD SL SN SO ST SZ TD TN TZ UG ZA ZM
Gulf Oil and Gas
Copyright © Universal Solutions All rights reserved. - Privacy Policy.