Gulf Oil and Gas accountACCOUNT

Winstar Provides Operational Updates in Tunisia

Source: www.gulfoilandgas.com 11/23/2010, Location: Africa

Share |
Winstar Resources Ltd. provides an update on the following operations in Tunisia:
· Well testing results for Chouech Essaida Triassic #13 well (“CS #13”);
· Update on the drilling of Chouech Essaida Silurian #1 well (“CS Sil #1”);

Well Operations at CS #13: Pursuant to the Press Release dated November 11, 2010 the Company reports that the testing of the 2,485 meter CS#13 well, has been unsuccessful in establishing production and the well has been suspended.

Since November 3, 2010 the Company has tested three zones within the Triassic TAGI Sandstone individually and also tested all three zones commingled using nitrogen and coiled tubing to provide artificial lift. The cumulative test results have been disappointing with relatively low production rates of water and uneconomic traces of oil.

Drilling Operations at CS Sil #1;
Winstar is currently drilling it’s first the Silurian Exploration well CS Sil #1 which spud in early November 2010. The well is drilled on an Ordovician Structure defined by 3D seismic and is prognosed to test the hydrocarbon potential of both the Silurian Acacus Sandstone and a shallower secondary target in the Triassic TAGI Sandstone. The well is expected to reach its projected total depth of 4,400 meters, with logging and casing to be completed by late December 2010. In the event of encouraging log interpretation, the well will be tested immediately thereafter.

Logging, Perforating, Testing >>

Logging, Perforating, Testing News in Tunisia >>

United States >>  6/13/2018 - 88 Energy Limited (88E) (88 Energy) is pleased to announce the following update for its projects located on the North Slope of Alaska. ...
Argentina >>  6/11/2018 - Echo Energy plc announces the succesful completion of the extended well test following the workover on well CSo-85 located in the mature Canadon Salto...

Argentina >>  6/6/2018 - Echo Energy plc, the Latin American focused upstream oil and gas company, announces the succesful completion of drilling of the ELA-1 exploration well...
United States >>  5/29/2018 - 88 Energy Limited (88E) (88 Energy) is pleased to announce the following update for its projects located on the North Slope of Alaska. ...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Tunisia Oil & Gas 1 >>  2 | 3 | 4 | 5 |

Oil & Gas Projects in Tunisia >>

More News

 

Oil & Gas Companies in Tunisia >>


Related Links

AO BJ BW CD CG CI CM DZ EG ET GA GH GM GN GQ GW KE LR LY MA MG ML MR MZ NA NE NG RW SC SD SL SN SO ST SZ TD TN TZ UG ZA ZM
Gulf Oil and Gas
Copyright © Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.