Gulf Oil and Gas accountACCOUNT

Gas Supply to Israel to Resume No Later than 4 March

Source: www.gulfoilandgas.com 2/27/2011, Location: Africa

Share |
Ampal-American Israel Corporation, a holding company in the business of acquiring and managing interests in various businesses, announced today that it was advised by East Mediterranean Gas Co. ("EMG"), that the gas supply to EMG, and therefore to EMG's Israeli Clients, is expected to resume no later than March 4th, 2011. Ampal has a 12.5% interest in EMG.

The Egyptian National Gas Company ("EGAS") informed EMG that repair works on GASCO's (the Egyptian gas transport company) pipeline system are continuing; testing of the system will start on Monday, March 2nd, 2011; and the target date for commercial gas delivery is no later than Friday, March 4th, 2011.

This information updates Ampal's previous announcements dated February 6, 2011, February 8, 2011 and February 16, 2011. Ampal had announced that a small portion of a GASCO pipeline serving EMG was damaged as a result of an explosion and subsequent fire in a metering station along a separate GASCO owned and operated gas pipeline from Egypt to Jordan. As previously announced, neither EMG's site nor EMG's pipeline were damaged as the affected GASCO station is not a part of the EMG pipeline system and is located some 30 kilometers (about 18.6 miles) from the EMG site.

Unrest in MENA - The New Oil Order

Oil and Gas Pipeline >>

Oil and Gas Pipeline News in Egypt >>

Azerbaijan >>  6/16/2017 - EMS-Fehn-Group celebrated the successful completion of the TAP project. Amongst the guests were the German ambassador in Tirana, Susanne Schütz, and h...
Azerbaijan >>  6/8/2017 - The Trans Adriatic Pipeline (TAP) AG announces that construction in Greece, the pipeline’s greatest geography, advances on time, on track and on budge...

Russia >>  6/8/2017 - The Gazprom in Eastern Russia, Entry into Asia-Pacific Markets Press Conference was held in Moscow today in the lead-up to the annual General Sharehol...
Qatar >>  6/6/2017 - Qatar has no plan to shut the Dolphin pipeline that transports natural gas to the United Arab Emirates despite the severing of diplomatic ties between...

Azerbaijan >>  6/5/2017 - 2 mln 237 thousand 140 tons of Azerbaijani oil were transported via BTC main export pipeline in May 2017. 10 mln 961 thousand 523 tons of oil were tr...
Qatar >>  6/5/2017 - A natural gas pipeline from Qatar to the United Arab Emirates and Oman was operating normally despite a Gulf political dispute with Doha, two industry...

Related Categories: General  LNG Carriers  LNG Terminal  Natural Gas Storage  Oil and Gas Pipeline  Oil Storage  Railways  Tank Truck  Tankers 

Related Articles: General  LNG Carriers  LNG Terminal  Natural Gas Storage  Oil and Gas Pipeline  Oil Storage  Railways  Tank Truck  Tankers 


Egypt Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 |

Oil & Gas Projects in Egypt >>

More News

 

Oil & Gas Companies in Egypt >>


Related Links

AO BJ BW CD CG CI CM DZ EG ET GA GH GM GN GQ KE LR LY MA MG ML MR MZ NA NE NG RW SC SD SL SN SO ST SZ TD TN TZ UG ZA ZM
Gulf Oil and Gas
Copyright © Universal Solutions All rights reserved. - Privacy Policy.