|
|
|
Source: www.gulfoilandgas.com 2/28/2011, Location: Asia
|
|
|
|
TNK-BP has begun building the 450 mcm pa Pokrovskaya gas treatment unit as part of its Orenburg Integrated Project, which is aimed at virtually eliminating flaring of associated gas and minimizing air emissions in the region.
The Pokrovskaya GTU will cost $195.9 mln and is scheduled for commissioning in May 2012.
The Orenburg Integrated Project, which embraces the main groups of fields operated by OJSC Orenburgneft and NGDU Sorochinskneft, involves building additional treatment facilities, new gas pipelines and gas compressor stations.
The project will raise the level of associated gas utilization at TNK-BP’s sites in the region to 95% in the near future.
|
|
|
|
|
|
|
| India Oil Trade in April 2013 |
 |
India >> 5/17/2013 - India’s crude oil imports dropped In March both on a monthly and on an annual basis. The drop is equal to 75 tb/d or 2% m-o-m, while y-o-y it saw a sl...
|
|
|

|
|
|
| FSU Oil Trade in April 2013 |
 |
Russia >> 5/15/2013 - In March, total crude oil exports from the FSU declined by 57 tb/d or 0.9% to average 6.4 mb/d. Crude exports through the Russian pipeline increased b...
|
|
|

|
|
|
| Asia Oil Supply – April 2013 |
 |
India >> 5/12/2013 - Asia’s oil production is expected to remain steady in 2013, compared with last year, with a minor increase of 30 tb/d to average 3.65 mb/d, representi...
|
|
|

|
|
|
More News
Related Links
Countries Quick Links
|