Gulf Oil and Gas accountACCOUNT

Candax Commences Workover on Robbana Field

Source: www.gulfoilandgas.com 3/18/2011, Location: Africa

Share |
Candax Energy Inc. is pleased to announce that a workover on the Robbana-1 well commenced on March 15, 2011. The Robbana-1 well has been shut in since June 2009. The workover is expected to last a few weeks and the data collected will enable Candax to better prepare for a stimulation workover of this well mid-year as well as for the anticipated re-development of this field.

Petroleum Insights Sarl ("Petroleum Insights"), an oil and gas consulting firm with the assistance of Denver-based MHA Petroleum Consultants LLC, has completed its study on the Robbana field.

Based on their analysis of pressure response data from the field during its 17 years of production history, Petroleum Insights has calculated a range of 18 to 25 million barrels of oil in place. Petroleum Insights has also forecast 4.3 to 5.8 million barrels of recoverable oil for 100% of the field (Candax has an 80% working-interest).

These figures are based on a numerical full field simulation study assuming enhanced recovery through conventional water flooding. Based on Petroleum Insight's positive evaluation, Candax is in the process of designing a water-flooding and development wells program to increase recovery from the field and to enable categorization of all or part of these preliminary figures as proven and probable reserves under NI 51-101 standards.

Production News in Tunisia >>

Libya >>  5/23/2018 - Libyan protesters shut down the eastern Raguba oilfield which had 5,000 barrels per day (bpd) of crude production feeding Brega port, said a spokesman...
Brazil >>  5/16/2018 - Petroleo Brasileiro S.A. – Petrobras reports that, in April, its total production of oil and gas, including natural gas liquids (NGL), was 2.68 millio...

Iran >>  5/15/2018 - The CEO of the Petroleum Engineering and Development Company (PEDEC) says the company is planning to ramp up crude oil production from the joint Azar ...
Russia >>  5/14/2018 - Site preparation and pre-development for a future diesel fuels hydrotreating facility has been started at the Gazprom Neft Omsk Refinery. The new comp...

Libya >>  5/13/2018 - Libya’s offshore Bahr al-Salam gas field has resumed operations with production of 380 million cubic feet per day, state firm NOC said after completin...
Egypt >>  5/10/2018 - Eni announces the start-up of the third production unit (T-2) of the Zohr project, increasing the installed capacity to 1.2 bcfd. Zohr is now producin...

Related Categories: Camp Building  Cleaning Equipment, Services  Communication  Corrosion Products/Services  Development  Exploration  Food Supplies  General  Labor Services  Land & Leasing  Mine Clearance  Oil & Gas Companies  Production  Service Companies  Skilled Labors  Transportation, 4X4 Trucks  Unskilled Labors  Utility Systems  Waste Disposal  Water Supply Services  Welding Products/Services 

Related Articles: Camp Building  Cleaning Equipment, Services  Communication  Corrosion Products/Services  Development  Exploration  General  Labor Services  Land & Leasing  Mine Clearance  Oil & Gas Companies  Production  Service Companies  Transportation, 4X4 Trucks  Utility Systems  Water Supply Services  Welding Products/Services 


Tunisia Oil & Gas 1 >>  2 | 3 | 4 | 5 |

Oil & Gas Projects in Tunisia >>

More News

 

Oil & Gas Companies in Tunisia >>


Related Links

AO BJ BW CD CG CI CM DZ EG ET GA GH GM GN GQ GW KE LR LY MA MG ML MR MZ NA NE NG RW SC SD SL SN SO ST SZ TD TN TZ UG ZA ZM
Gulf Oil and Gas
Copyright © Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.