Gulf Oil and Gas accountACCOUNT

Candax Announces Progress on Robbana Work-Over

Source: www.gulfoilandgas.com 4/11/2012, Location: Africa

Share |
Candax Energy Inc announces the following update on the Robbana work-over. The Robbana-1 well was shut in on January 13th to initiate civil work in preparation for a work-over in advance of the mobilization of a rig. On February 14th, the rig was mobilized and the work-over commenced. The work-over has now been completed and the rig demobilized. During the work-over, the two formation intervals were successfully re-perforated, there was a tubing change and the activation system was adjusted. Production will now be re-initiated and closely monitored for improvements over the coming weeks. The technical information gathered from the work-over will also be studied to help formulate a plan for the further development of the field.

Workover & Well Services News in Tunisia >>

Egypt >>  5/14/2018 - Last week, the Minister of Energy of Cyprus, Mr. George Lakkotrypis, and the Minister of Petroleum and Mineral Resources of Egypt, Eng. Tarek El Molla...
Libya >>  5/13/2018 - Libya’s offshore Bahr al-Salam gas field has resumed operations with production of 380 million cubic feet per day, state firm NOC said after completin...

Egypt >>  5/10/2018 - Eni announces the start-up of the third production unit (T-2) of the Zohr project, increasing the installed capacity to 1.2 bcfd. Zohr is now producin...
Egypt >>  5/3/2018 - Eni announces an oil discovery on the A-2X exploration prospect located in South West Meleiha license, in the Egyptian Western Desert, some 103 Km Nor...

Morocco >>  5/2/2018 - Shearwater GeoServices (Shearwater) has been awarded a contract to acquire 3D seismic for Genel Energy in the Sidi Moussa license offshore Morocco. Ad...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Tunisia Oil & Gas 1 >>  2 | 3 | 4 | 5 |

Oil & Gas Projects in Tunisia >>

More News

 

Oil & Gas Companies in Tunisia >>


Related Links

AO BJ BW CD CG CI CM DZ EG ET GA GH GM GN GQ GW KE LR LY MA MG ML MR MZ NA NE NG RW SC SD SL SN SO ST SZ TD TN TZ UG ZA ZM
Gulf Oil and Gas
Copyright © Universal Solutions All rights reserved. - Privacy Policy.