Gulf Oil and Gas accountACCOUNT

Burren Energy Provides Congo (Brazzaville) Update

Source: www.gulfoilandgas.com 11/3/2005, Location: Africa

Share |
Burren announces the positive results of the 3 latest development wells on the M’Boundi field completed during October 2005.
Well: MBD 1005, M’Boundi Location: Northern infill, Test flow rate: 4,500 bopd
Well: MBD 1103, M’Boundi Location: Western perimeter, Test flow rate: 1,600 bopd
Well: MBD 1902, M’Boundi Location: Central infill, Test flow rate: 3,500 bopd

These wells will be placed on production during November.

A fourth well, MBD 1803 located on the south-east perimeter of the field, has not yet been tested in the Vandji reservoir, and is awaiting testing to evaluate the potential of a possible secondary reservoir encountered by the well

Drilling News in Congo >>

Norway >>  7/18/2018 - The Petroleum Directorate has granted Equinor Energy AS a drilling permit for wells 35/10-4 S, 35/10-4 A and 35/10-4 B, cf. Section 15 of the Resource...
Australia >>  7/13/2018 - Carnarvon Petroleum Limited provides the following update on the drilling of the Dorado-1 well. ...

Norway >>  7/10/2018 - Hundreds of workers on Norwegian oil and gas offshore rigs will go on strike on Tuesday after rejecting a proposed wage deal, a state-appointed mediat...
Indonesia >>  7/6/2018 - Range Resources has provided an update on the operations at the Perlak field, located in Northern Sumatra, Indonesia. As previously announced, the ope...

Norway >>  7/6/2018 - A/S Norske Shell, operator of production licence 373S, has completed the drilling of wildcat well 34/5-2 S. The well is dry. The well was drilled abou...
Egypt >>  7/5/2018 - Rockhopper Exploration plc (RKH), the oil and gas exploration and production company with key interests in the North Falklands Basin and the Greater M...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Congo Oil & Gas 1 >>  2 |

Oil & Gas Projects in Congo >>

More News

 

Oil & Gas Companies in Congo >>


Related Links

AO BJ BW CD CG CI CM DZ EG EH ET GA GH GM GN GQ GW KE LR LY MA MG ML MR MZ NA NE NG RW SC SD SL SN SO ST SZ TD TN TZ UG ZA ZM
Gulf Oil and Gas
Copyright © Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.