Gulf Oil and Gas accountACCOUNT

Calvalley Petroleum Provides Yemen Operations Update

Source: www.gulfoilandgas.com 1/5/2006, Location: Middle East

Share |
Calvalley Petroleum provided the following update on its operations on Block 9 in Yemen. The drilling rig was released on January 3, 2006 from the seventh horizontal Hiswah well, which was spudded on December 22, 2005. The well was drilled horizontally into the oil-bearing Saar-Naifa formation and is located approximately 275 metres west of the Hiswah-6. The well penetrated oilsaturated, porous, carbonate grainstones over much of its horizontal length. Drilling rig is currently being moved to the next Hiswah horizontal well site and is expected to spud the well within few days.

The level of oil receipt at Block 18 operated by Safer Exploration and Production at the year end was 3200 bbls per day from Block 9 and gradually increased to 5000 bbls on January 3, 2005. Good progress is being made on the expansion of the unloading facility on Block 18. Upon de-bottlenecking, oil receipt is expected to average 10,000 bbls per day (5,000 bbls per day net to Calvalley)

Rig Equipment >>

Rig Equipment News in Yemen >>

Iraq >>  12/13/2017 - Petrofacís Engineering & Production Services (EPS) division has secured an award worth US$160 million from Basra Oil Company (BOC), previously known a...
Oman >>  12/12/2017 - Petrofac has been awarded a lump-sum contract worth approximately US$800 million by BP for the Phase 2 central processing facility (CPF) at the Khazza...

Bahrain >>  12/4/2017 - TechnipFMC announced that, jointly with Samsung Engineering and Tecnicas Reunidas, it has been awarded a $4.2 billion USD contract from Bahrain Petrol...
Qatar >>  12/4/2017 - Ampelmann has secured a contract to supply its A-type gangway system to North Oil Company (NOC) on the chartered Bourbon Gulf Star DP2 72 PAX support ...

Kuwait >>  11/29/2017 - Oil requirements also increased in Kuwait and the UAE by 3% and 2%, respectively, y-o-y as growth in the transportation fuels appeared to be the main ...
Kuwait >>  11/28/2017 - W. R. Grace & Co., the leading supplier of polyolefin catalyst technology and polypropylene (PP) process technology, has contracted to license its UNI...

Related Categories: General  Rig Equipment  Rig Operators  Rigs, Coring & Exploration 

Related Articles: General  Rig Equipment  Rig Operators  Rigs, Coring & Exploration 


Yemen Oil & Gas 1 >>  2 | 3 | 4 | 5 |

Oil & Gas Projects in Yemen >>

More News

 

Oil & Gas Companies in Yemen >>


Related Links

AE BH IL IQ JO KW LB OM QA SA SY YE
Gulf Oil and Gas
Copyright © Universal Solutions All rights reserved. - Privacy Policy.