Gulf Oil and Gas accountACCOUNT

DNO Announces The Godah # 1 Side-Track Well in Block 32, Yemen tested 1.839 bopd

Source: www.gulfoilandgas.com 2/24/2006, Location: Middle East

Share |
DNO ASA Announced that the original Godah # 1 exploration well was drilled at a separate structure ca. 14 km east of the Tasour Field. The main target was the Qishn S1A sandstone and the well confirmed the presence of oil and gas in the Qishn reservoir. The well has now been side-tracked down-dip of the original location with the objective to penetrate a full oil bearing Qishn S1A section. The side-track of Godah # 1 was drilled to TD of 1.841m on 8 February 2006.

The well was then logged and tested. The logs proved a full oil column in the S1A sand. The test provided an oil rate of 1.839 bopd (gross) on natural flow, with nil water-cut and a GOR of 2.412 scf/bbl. The relative high GOR is likely explained by influx of free gas from the gas zone proven in the original well path of Godah # 1.

The license partners have now agreed to drill an appraisal well on the Godah structure. The well Godah # 2 will be drilled further down flank of the Godah # 1 side-track location to evaluate the area extension of the oil accumulation and possible prove the oil-water contact.

Production from the Godah structure can be tied back to the Tasour production facilities for processing and export.

Drilling News in Yemen >>

Saudi Arabia >>  12/16/2017 - Saudi Aramco has awarded Schlumberger two lump sum contracts for drilling rigs and services for oil and gas wells. Under the contracts, Schlumberger I...
Mauritania >>  12/12/2017 - Kosmos Energy has completed drilling the Lamantin-1 exploration well located in Block C-12 offshore Mauritania in approximately 2,200 meters of water....

Mexico >>  12/12/2017 - Eni successfully drilled the Tecoalli 2 well, in the shallow waters of the Campeche Bay, offshore Mexico. Thanks to the results of this well and the r...
Congo >>  12/11/2017 - Anglo African Oil & Gas plc, an independent oil and gas developer, is pleased to announce a corporate update in line with its plan to increase product...

Uruguay >>  12/11/2017 - Petrel Energy Limited announces that Schuepbach Energy Uruguay SRL (SEU) has temporarily suspended operations at the Cerro de Chaga-1 well to review o...
Norway >>  12/8/2017 - CHC Group announced it has been awarded the contract from Centrica to provide helicopter services in support of their forthcoming drilling program at ...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Yemen Oil & Gas 1 >>  2 | 3 | 4 | 5 |

Oil & Gas Projects in Yemen >>

More News

 

Oil & Gas Companies in Yemen >>


Related Links

AE BH IL IQ JO KW LB OM QA SA SY YE
Gulf Oil and Gas
Copyright Universal Solutions All rights reserved. - Privacy Policy.