Gulf Oil and Gas accountACCOUNT

DNO Announces Yemen Drilling Status

Source: www.gulfoilandgas.com 3/9/2006, Location: Middle East

Share |
Nabrajah # 9 (Block 43) Sidetrack has reached its total depth of 2418 meters, some 213 meters into the Basement. It has been decided to perform two production tests in the well; one in the Basement interval and one in the overlaying Kohlan formation. The objectives of the testing are to evaluate the significance of oil shows and elevated gas readings which were recorded while drilling these intervals.

Bayoot SW # 1 (Block 53) has reached its total depth of 3532 meters, some 613 meters into the Basement. An open hole test has been performed in the Basement interval, but the well failed to flow. Two more tests are planned in the well; one in a sandstone interval immediate overlaying the Basement and one on the Naifa carbonates. Oil shows and elevated gas reading were recorded while drilling these intervals. However, due to failure of some of the available testing equipment these two tests will be undertaken at a later stage. Timing is dependent on the schedule and priorities for rig utilization in Block 53. The rig will now move to the location of Tasour # 21, which is an appraisal well at the Tasour Field in Block 32.

Drilling News in Yemen >>

Mongolia >>  9/20/2018 - Petro Matad, the AIM quoted Mongolian oil explorer, provides a summary of the results from its Snow Leopard 1 well: ...
Trinidad and Tobago >>  9/20/2018 - Range, an international oil and gas company with oil and gas projects and oilfield service businesses in Trinidad and Indonesia, is pleased to provide...

Canada >>  9/18/2018 - Seadrill Partners LLC ("SDLP" ) has secured a one well contract with multiple options with ExxonMobil Canada, Ltd., for the West Aquarius in Canada....
Botswana >>  9/17/2018 - Tlou Energy Limited, the ASX, AIM and BSE listed company focused on developing gas-to-power projects in southern Africa using coal bed methane ("CBM")...

Romania >>  9/17/2018 - Serinus Energy plc has announced the flow-test results of the Moftinu 1003 well. As previously announced, the Moftinu 1003 well was drilled to 1,6...
United Kingdom >>  9/17/2018 - Reabold is pleased to note the successful completion of the rig site survey over the proposed location for the forthcoming Wick well. ...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Yemen Oil & Gas 1 >>  2 | 3 | 4 | 5 |

Oil & Gas Projects in Yemen >>

More News

 

Oil & Gas Companies in Yemen >>


Related Links

AE BH IL IQ JO KW LB OM QA SA SY YE
Gulf Oil and Gas
Copyright Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.