Gulf Oil and Gas accountACCOUNT

DNO Announces Yemen Drilling Status

Source: www.gulfoilandgas.com 3/9/2006, Location: Middle East

Share |
Nabrajah # 9 (Block 43) Sidetrack has reached its total depth of 2418 meters, some 213 meters into the Basement. It has been decided to perform two production tests in the well; one in the Basement interval and one in the overlaying Kohlan formation. The objectives of the testing are to evaluate the significance of oil shows and elevated gas readings which were recorded while drilling these intervals.

Bayoot SW # 1 (Block 53) has reached its total depth of 3532 meters, some 613 meters into the Basement. An open hole test has been performed in the Basement interval, but the well failed to flow. Two more tests are planned in the well; one in a sandstone interval immediate overlaying the Basement and one on the Naifa carbonates. Oil shows and elevated gas reading were recorded while drilling these intervals. However, due to failure of some of the available testing equipment these two tests will be undertaken at a later stage. Timing is dependent on the schedule and priorities for rig utilization in Block 53. The rig will now move to the location of Tasour # 21, which is an appraisal well at the Tasour Field in Block 32.

Drilling News in Yemen >>

Mauritania >>  12/12/2017 - Kosmos Energy has completed drilling the Lamantin-1 exploration well located in Block C-12 offshore Mauritania in approximately 2,200 meters of water....
Mexico >>  12/12/2017 - Eni successfully drilled the Tecoalli 2 well, in the shallow waters of the Campeche Bay, offshore Mexico. Thanks to the results of this well and the r...

Congo >>  12/11/2017 - Anglo African Oil & Gas plc, an independent oil and gas developer, is pleased to announce a corporate update in line with its plan to increase product...
Uruguay >>  12/11/2017 - Petrel Energy Limited announces that Schuepbach Energy Uruguay SRL (SEU) has temporarily suspended operations at the Cerro de Chaga-1 well to review o...

Norway >>  12/8/2017 - CHC Group announced it has been awarded the contract from Centrica to provide helicopter services in support of their forthcoming drilling program at ...
Russia >>  12/7/2017 - LUKOIL has finished most of the construction works at the Vladimir Filanovsky field's Phase 2 development facilities and started drilling of the first...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Yemen Oil & Gas 1 >>  2 | 3 | 4 | 5 |

Oil & Gas Projects in Yemen >>

More News

 

Oil & Gas Companies in Yemen >>


Related Links

AE BH IL IQ JO KW LB OM QA SA SY YE
Gulf Oil and Gas
Copyright Universal Solutions All rights reserved. - Privacy Policy.