Gulf Oil and Gas accountACCOUNT

Candax Announces Preliminary Drilling Update on Chaal-1 Well Onshore Tunisia

Source: www.gulfoilandgas.com 4/10/2006, Location: Africa

Share |
Candax Energy Inc.provided an update on the drilling of the Chaal-1 well which was spudded on February 5, 2006. On April 3, 2006, the well penetrated a hydrocarbon bearing section in the target reservoir, the Middle/Lower Nara, at a depth of 4,036 meters. To date, a gross reservoir interval of 304 meters has been drilled, with the well depth currently at 4,340 meters.

There have been excellent gas shows throughout this 304 meter interval, including C5 (condensate) at numerous intervals since entering the reservoir. Drilling through the reservoir interval has been steady, with numerous gas kicks encountered. Candax has been gradually increasing the mud weight during drilling to maintain the pressure balance and to minimize potential formation damage prior to testing.

At a depth of 4,340 metres another significant gas kick was experienced, and the well again began flowing. At this point, it was decided to stop drilling and run an intermediate log suite. Schlumberger are on standby at the well site to begin logging once the well has been stabilized. Following the intermediate logging, it is anticipated that drilling will continue until the full hydrocarbon bearing section has been penetrated. Once total depth is reached, further logging will take place and then the well will be tested following log analysis.

Michael Wood, President & CEO commented, "The preliminary results from the Chaal-1 well are extremely encouraging and we are awaiting the results from the logging to establish the full hydrocarbon column and testing to establish the production capability of the reservoir of the large gas/condensate structure at Chaal."

Drilling News in Tunisia >>

Nigeria >>  8/16/2018 - Eland Oil & Gas PLC, an oil & gas production and development company operating in West Africa with an initial focus on Nigeria, is pleased to announce...
Norway >>  8/16/2018 - Equinor Energy AS, operator of production licence 025, has concluded the drilling of appraisal well 15/3-11 on the 15/3-4 (Sigrun) oil and gas discove...

Trinidad and Tobago >>  8/16/2018 - Range, an international oil and gas company with assets in Trinidad and Indonesia, and an oilfield services business in Trinidad, is pleased to provid...
Congo >>  8/15/2018 - Anglo African Oil & Gas plc, an independent oil and gas developer, is pleased to confirm that the TLP-103 well ('TLP-103' or 'the Well') on the Tilapi...

Argentina >>  8/13/2018 - Echo Energy plc, the Latin American focused upstream oil and gas company, has announced an update on the ongoing testing programme in the Company's Fr...
Morocco >>  8/13/2018 - Sound Energy, the Moroccan focused upstream gas company, has announced the mobilisation of the National 110 IE (1500HP) land drilling rig owned by Sai...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Tunisia Oil & Gas 1 >>  2 | 3 | 4 | 5 |

Oil & Gas Projects in Tunisia >>

More News

 

Oil & Gas Companies in Tunisia >>


Related Links

AO BJ BW CD CG CI CM DZ EG ET GA GH GM GN GQ GW KE LR LY MA MG ML MR MZ NA NE NG RW SC SD SL SN SO ST SZ TD TN TZ UG ZA ZM
Gulf Oil and Gas
Copyright Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.