Gulf Oil and Gas accountACCOUNT

Africa Hydrocarbons Provides Details on the Re-Completion Operations at BHN-1 Well

Source: www.gulfoilandgas.com 4/23/2014, Location: Africa

Share |
Africa Hydrocarbons Inc provided the following operational update regarding the Company's BHN-1 exploration well on the Bouhajla Permit (47.5% WI) in northeastern Tunisia.

The Company has completed preparations for the re-completion of its BHN-1 exploration well on the Bouhajla Permit in northeastern Tunisia. The re-completion will entail pulling the existing production tubing from the wellbore and re-perforating the Abiod formation using a casing gun and deep penetrating charges, followed by selective acidization of the individual perforation intervals. One additional zone within the Abiod will be perforated bringing the total number of zones to be evaluated to four. A workover rig has now been contracted and will move to the BHN-1 location once released from its current operation, anticipated to be in mid May 2014. The entire re-completion operation is expected to take 10-14 days. Extended flow testing will take place at a later date depending on the results of the re-completion operation.

"A rigorous re-completion plan has been developed to adequately evaluate the hydrocarbon potential we believe exists within the Abiod," states Mr. John Nelson, CEO of the Company. "The Company remains of the view that the initial perforation attempt and acid injection previously undertaken was not successful in accessing the formation thereby necessitating the re-completion operation."

For more information about related Opportunities and Key Players visit North Africa Projects

Well Completion, Logging, Workover News in Tunisia >>

Egypt >>  5/14/2018 - Last week, the Minister of Energy of Cyprus, Mr. George Lakkotrypis, and the Minister of Petroleum and Mineral Resources of Egypt, Eng. Tarek El Molla...
Libya >>  5/13/2018 - Libya’s offshore Bahr al-Salam gas field has resumed operations with production of 380 million cubic feet per day, state firm NOC said after completin...

Egypt >>  5/10/2018 - Eni announces the start-up of the third production unit (T-2) of the Zohr project, increasing the installed capacity to 1.2 bcfd. Zohr is now producin...
Egypt >>  5/3/2018 - Eni announces an oil discovery on the A-2X exploration prospect located in South West Meleiha license, in the Egyptian Western Desert, some 103 Km Nor...

Morocco >>  5/2/2018 - Shearwater GeoServices (Shearwater) has been awarded a contract to acquire 3D seismic for Genel Energy in the Sidi Moussa license offshore Morocco. Ad...

Related Categories: Formation Evaluation  General  Geological, Geophysical  Geophysical Contractors  Mud Logging  Reservoir Engineering & Recovery Methods  Seismic survey  Well Completion, Logging, Workover 

Related Articles: Formation Evaluation  General  Geological, Geophysical  Geophysical Contractors  Mud Logging  Reservoir Engineering & Recovery Methods  Seismic survey  Well Completion, Logging, Workover 


Tunisia Oil & Gas 1 >>  2 | 3 | 4 | 5 |

Oil & Gas Projects in Tunisia >>

More News

 

Oil & Gas Companies in Tunisia >>


Related Links

Gulf Oil and Gas
Copyright © Universal Solutions All rights reserved. - Privacy Policy.