Gulf Oil and Gas accountACCOUNT

Candax Commences Drilling at El Bibane

Source: www.gulfoilandgas.com 7/31/2007, Location: Africa

Share |
Candax Energy has commenced drilling of the first well in the three-well development program on the El Bibane oil and gas field, offshore Tunisia. The EBB-4 is being drilled using the West Titania jack-up rig. First oil and gas production from EBB-4 is expected by the first week of October 2007. Upon completion of EBB-4, the West Titania rig will move to the second well location, EBB-3RE2, to re-complete the existing well by drilling a new, horizontal production well in the oil column. It is anticipated that the completion of EBB-3RE2 should take approximately 30 days, when the rig will be moved to the final location, EBB-5, which will be used as a gas re-injection well. First gas injection is likely to commence early in December.

Offshore Drilling News in Tunisia >>

Egypt >>  2/19/2018 - Noble Energy, Inc. has signed agreements to sell significant quantities of natural gas from the Leviathan and Tamar fields to Dolphinus Holdings Limit...
Egypt >>  2/14/2018 - C-Kore Systems closed off an excellent 2017 with an installation/commissioning campaign for the Egyptian Atoll project in collaboration with Subsea 7’...

Egypt >>  2/12/2018 - BP announced the start of gas production from the Atoll Phase One project, offshore Egypt. The project, in the North Damietta concession in the East N...
Egypt >>  2/2/2018 - Petroleum Minister Tareq el Molla discussed in a meeting with CEO of Kuwait Petroleum Corporation (KPC) Nizar Mohammad Al Adsani ways of boosting bila...

Egypt >>  1/29/2018 - Yokogawa Electric Corporation announces that its subsidiary, Yokogawa Middle East & Africa B.S.C.(c), has received an order from the state-owned Egypt...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Tunisia Oil & Gas 1 >>  2 | 3 | 4 | 5 |

Oil & Gas Projects in Tunisia >>

More News

 

Oil & Gas Companies in Tunisia >>


Related Links

AO BJ BW CD CG CI CM DZ EG ET GA GH GM GN GQ GW KE LR LY MA MG ML MR MZ NA NE NG RW SC SD SL SN SO ST SZ TD TN TZ UG ZA ZM
Gulf Oil and Gas
Copyright © Universal Solutions All rights reserved. - Privacy Policy.