Gulf Oil and Gas accountACCOUNT

Addax Petroleum Announces Update To Continued Appraisal Program At Taq Taq

Source: www.gulfoilandgas.com 1/21/2008, Location: Middle East

Share |
Addax Petroleum Corporation announced flow test results for the TT-09 well, the fifth appraisal and development well recently drilled on the Taq Taq field by Taq Taq Operating Company, the joint venture company formed by Genel Enerji A.S. and Addax Petroleum to carry out the petroleum operations in the Taq Taq license area.

Two reservoir intervals were tested separately and flowed at an aggregate rate of 16,170 bbl/d of light oil, measured gravity of 48 degrees API with low gas oil ratio. The intervals tested were a 231 meter completion interval in the Shiranish formation which flowed at a rate of 2,580 bbl/d and a 104 meter interval in the Kometan formation which flowed at a rate of 13,590 bbl/d. The testing of the third formation, the Qamchuqa formation, experienced completion problems and produced test results which the Corporation believes are not representative of the formation. Oil flow rates from the Shiranish and Kometan intervals were restricted by 40/64” and 128/64” choke sizes respectively. Evaluation of these flow test results is ongoing.

TT-09 is a step-out well located approximately 1.7 kilometres southwest of the TT-04 well, which was located near the crest of the Taq Taq field. TT-09 is the first of two wells designed to appraise the flanks of the Taq Taq structure. The TT-09 well was spudded the last day of August and completed drilling in the end of October at a total depth of 2,444 metres. Testing of TT-09 commenced in mid-December, 2007. Interpretation of data acquired from TT-09, including wireline and 27 metres of core, confirmed the presence of a significant and extensive fracture system in the tested formations as observed in the TT-04, TT-05, TT-06 and TT-07 wells.

The TT-09 well is the fifth of a six well drilling and seismic appraisal program by Addax Petroleum and Genel. The drilling of the sixth appraisal well, TT-08, has been completed and is being prepared for flow testing. The TT-08 well is located approximately 1.7 kilometres east of the TT-04 well along the minor axis of the Taq Taq field. In addition to the ongoing drilling program, Addax Petroleum and Genel have recently completed shooting 290 square kilometres of 3D seismic over the Taq Taq field. The results of the drilling and seismic appraisal program are being integrated into a full field development plan which Addax Petroleum and Genel expect to commence implementing in 2008. The first stage of a full field development plan is expected to include an early production system with the goal of producing approximately 10 Mbbl/d during the second half of 2008 from the Taq Taq field.

Testing >>

Testing News in Iraq >>

Iraq >>  12/13/2017 - Petrofac’s Engineering & Production Services (EPS) division has secured an award worth US$160 million from Basra Oil Company (BOC), previously known a...
Oman >>  12/12/2017 - Petrofac has been awarded a lump-sum contract worth approximately US$800 million by BP for the Phase 2 central processing facility (CPF) at the Khazza...

Bahrain >>  12/4/2017 - TechnipFMC announced that, jointly with Samsung Engineering and Tecnicas Reunidas, it has been awarded a $4.2 billion USD contract from Bahrain Petrol...
Qatar >>  12/4/2017 - Ampelmann has secured a contract to supply its A-type gangway system to North Oil Company (NOC) on the chartered Bourbon Gulf Star DP2 72 PAX support ...

Kuwait >>  11/29/2017 - Oil requirements also increased in Kuwait and the UAE by 3% and 2%, respectively, y-o-y as growth in the transportation fuels appeared to be the main ...
Kuwait >>  11/28/2017 - W. R. Grace & Co., the leading supplier of polyolefin catalyst technology and polypropylene (PP) process technology, has contracted to license its UNI...

Related Categories: General  Hydrostatic Testing  Inspection  Laboratory Services  Non Destructive Testing  Testing 

Related Articles: General  Hydrostatic Testing  Inspection  Laboratory Services  Non Destructive Testing  Testing 


Iraq Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 |

Oil & Gas Projects in Iraq >>

More News

 

Oil & Gas Companies in Iraq >>


Related Links

AE BH IL IQ JO KW LB OM QA SA SY YE
Gulf Oil and Gas
Copyright © Universal Solutions All rights reserved. - Privacy Policy.