Gulf Oil and Gas accountACCOUNT

ALTUS Intervention Secures Long Term Agreement with Statoil

Source: www.gulfoilandgas.com 7/7/2016, Location: Europe

Share |
ALTUS Intervention secures long term frame agreement with Statoil. The agreement involves the provision of mechanical wireline and fishing, as well as cased hole logging and tractor conveyance as optional services. A total of 16 fixed installations, Gina Krog, Gudrun, Heidrun, Heimdal, Johan Sverdrup, Kvitebjorn, Oseberg (B, C, H, East and South), Troll, Valemon, Veslefrikk og Visund, will be covered by the agreement.

The start of the agreement will be February 1st 2017. Age Landro, CEO Of Qinterra AS said: “ALTUS Intervention are pleased to be continuing working with Statoil on this portfolio of installations for another 10 years. This is an important award for us and it confirms the quality of the services we already provide to Statoil. Our position as the market leader in mechanical wireline in the North Sea will be maintained with this agreement secured, which is an important part of the company’s strategy.”

Casing, Tubing & Drill Pipes >>

Casing, Tubing & Drill Pipes News in Norway >>

Austria >>  11/21/2017 - Non-OPEC supply in 2018 was revised down by 94 tb/d compared to last month’s analysis to average 58.54 mb/d, and now is expected to grow at a slower p...
Norway >>  11/16/2017 - Preliminary data for September showed that total European stocks fell by 11.8 mb reversing the build of last two months. At 1,133 mb, European stocks ...

Norway >>  11/16/2017 - Kvaerner has been awarded a contract with Repsol Norge AS for the construction of a permanent caisson support structure for the Yme New Development pr...
Austria >>  11/15/2017 - US product markets received very strong support in the previous months on the back of significantly higher US gasoline demand. However, with the end o...

Norway >>  11/15/2017 - Shearwater GeoServices (Shearwater) has been awarded a 3D broadband marine seismic acquisition contract by ONGC for the planned 2017/2018 field season...
Austria >>  11/14/2017 - OPEC crude for 2018 was also revised up by 0.4 mb/d from the previous report to stand at 33.4 mb/d, around 0.5 mb/d higher than the 2017 level.


Related Categories: Blowout Preventers Ram, Rotary, Spherical & Annular  Casing, Tubing & Drill Pipes  Coiled Tubing  Drill Bits and Cutters  Extraction Equipment  General  Handling Tools  Hoisting Systems  Lubricating Equipment 

Related Articles: Blowout Preventers Ram, Rotary, Spherical & Annular  Casing, Tubing & Drill Pipes  Coiled Tubing  Drill Bits and Cutters  Extraction Equipment  General  Handling Tools  Lubricating Equipment 


Norway Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 |

More News

 

Oil & Gas Companies in Norway >>


Related Links

Gulf Oil and Gas
Copyright © Universal Solutions All rights reserved. - Privacy Policy.