Gulf Oil and Gas accountACCOUNT

ALTUS Intervention Secures Long Term Agreement with Statoil

Source: www.gulfoilandgas.com 7/7/2016, Location: Europe

Share |
ALTUS Intervention secures long term frame agreement with Statoil. The agreement involves the provision of mechanical wireline and fishing, as well as cased hole logging and tractor conveyance as optional services. A total of 16 fixed installations, Gina Krog, Gudrun, Heidrun, Heimdal, Johan Sverdrup, Kvitebjorn, Oseberg (B, C, H, East and South), Troll, Valemon, Veslefrikk og Visund, will be covered by the agreement.

The start of the agreement will be February 1st 2017. Age Landro, CEO Of Qinterra AS said: “ALTUS Intervention are pleased to be continuing working with Statoil on this portfolio of installations for another 10 years. This is an important award for us and it confirms the quality of the services we already provide to Statoil. Our position as the market leader in mechanical wireline in the North Sea will be maintained with this agreement secured, which is an important part of the company’s strategy.”

Casing, Tubing & Drill Pipes >>

Casing, Tubing & Drill Pipes News in Norway >>

Norway >>  6/21/2017 - The Ministry of Petroleum and Energy announces the 24th licensing round on the Norwegian Continental Shelf. The licensing round includes a total of 10...
Austria >>  6/19/2017 - OECD Europe’s total commercial stocks fell by 9.5 mb in April, ending the month at 1,005 mb, which is 2.3 mb lower than the same time a year ago, but ...

Austria >>  6/15/2017 - Demand for OPEC crude in 2017 was revised up by 0.1 mb/d from the previous month. This upward adjustment was mainly due to the downward revision in no...
Austria >>  6/7/2017 - Oil futures on both sides of the Atlantic recovered, m-o-m, but their upward potential is still limited by a resurgence of shale and other oil output....

Austria >>  6/6/2017 - Open interest (OI) increased in April for selected US commodity markets such as agriculture, natural gas, precious metals, copper and livestock, while...
Austria >>  5/29/2017 - The refinery utilisation rate in the US averaged around 92% during April, corresponding to 17.0 mb/d. This represented an increase of more than 1 mb/d...

Related Categories: Blowout Preventers Ram, Rotary, Spherical & Annular  Casing, Tubing & Drill Pipes  Coiled Tubing  Drill Bits and Cutters  Extraction Equipment  General  Handling Tools  Hoisting Systems  Lubricating Equipment 

Related Articles: Blowout Preventers Ram, Rotary, Spherical & Annular  Casing, Tubing & Drill Pipes  Coiled Tubing  Drill Bits and Cutters  Extraction Equipment  General  Handling Tools  Lubricating Equipment 


Norway Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 |

More News

 

Oil & Gas Companies in Norway >>


Related Links

Gulf Oil and Gas
Copyright © Universal Solutions All rights reserved. - Privacy Policy.