Gulf Oil and Gas accountACCOUNT

41,705 Meters Drilling of Oil&Gas Wells in H1 of 2016

Source: Shana 11/3/2016, Location: Asia

Share |
Director of the Onshore Drilling Operations Department at the National Iranian Drilling Company (NIDC) Saeed Akbari says 41,705 meters drilling was recorded in the first half (March 20-September 21) this year (started on March 20).

Akbari said the drilling was in the areas covered by the National Iranian South Oil Company (NISOC) and the Exploration Department of the National Iranian Oil Company (NIOC).

He said an exploration well, 10 developmental wells, and four other wells were repaired in the first half of this year by the NIDC Onshore Drilling Management Department staff.

He added that his department is now availed with 16 light and heavy drilling rigs. "Out of the rigs, two are employed for drilling the exploration-descriptive, 11 for drilling the developmental wells and three for repair of wells."

The Fath 67 drilling rig alone drilled 4,311 meters in the period and Fath 95 drilling rig joined the fleet in May this year, he concluded.

Drilling News in Iran >>

Indonesia >>  10/16/2017 - JV partner Lion Energy reports that the South Block A PSC joint venture (Lion equity share: 40.7%) has formally approved drilling of the AMT-2 well to...
United States >>  10/16/2017 - From 1 September 2016 to 25 August 2017 we conducted an audit of ExxonMobil's activities relating to module-based drilling facilities and permanent pl...

United Kingdom >>  10/13/2017 - Angus Energy has successfully completed the drilling of the Lidsey-X2 production well. The Company will produce from a “net oil pay” section of 443 me...
Singapore >>  10/12/2017 - AkerBP has received consent to use Maersk Interceptor on the Tambar field for drilling and completion of wells 1/3-K-4 and 1/3-K-2.

...


Thailand >>  10/11/2017 - Tap Oil Limited provides the following update on the Manora Oil Field in the Northern Gulf of Thailand (TAP 30% interest). Mubadala Petroleum, Operato...
Malaysia >>  10/10/2017 - Semi-submersible Maersk Deliverer has been awarded a new contract by JX Nippon with an estimated duration of 30 days. The contract covers the drilling...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Iran Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 |

More News

 

Oil & Gas Companies in Iran >>


Related Links

Gulf Oil and Gas
Copyright © Universal Solutions All rights reserved. - Privacy Policy.