Gulf Oil and Gas accountACCOUNT

41,705 Meters Drilling of Oil&Gas Wells in H1 of 2016

Source: Shana 11/3/2016, Location: Asia

Share |
Director of the Onshore Drilling Operations Department at the National Iranian Drilling Company (NIDC) Saeed Akbari says 41,705 meters drilling was recorded in the first half (March 20-September 21) this year (started on March 20).

Akbari said the drilling was in the areas covered by the National Iranian South Oil Company (NISOC) and the Exploration Department of the National Iranian Oil Company (NIOC).

He said an exploration well, 10 developmental wells, and four other wells were repaired in the first half of this year by the NIDC Onshore Drilling Management Department staff.

He added that his department is now availed with 16 light and heavy drilling rigs. "Out of the rigs, two are employed for drilling the exploration-descriptive, 11 for drilling the developmental wells and three for repair of wells."

The Fath 67 drilling rig alone drilled 4,311 meters in the period and Fath 95 drilling rig joined the fleet in May this year, he concluded.

Drilling News in Iran >>

Mauritania >>  12/12/2017 - Kosmos Energy has completed drilling the Lamantin-1 exploration well located in Block C-12 offshore Mauritania in approximately 2,200 meters of water....
Mexico >>  12/12/2017 - Eni successfully drilled the Tecoalli 2 well, in the shallow waters of the Campeche Bay, offshore Mexico. Thanks to the results of this well and the r...

Congo >>  12/11/2017 - Anglo African Oil & Gas plc, an independent oil and gas developer, is pleased to announce a corporate update in line with its plan to increase product...
Uruguay >>  12/11/2017 - Petrel Energy Limited announces that Schuepbach Energy Uruguay SRL (SEU) has temporarily suspended operations at the Cerro de Chaga-1 well to review o...

Norway >>  12/8/2017 - CHC Group announced it has been awarded the contract from Centrica to provide helicopter services in support of their forthcoming drilling program at ...
Russia >>  12/7/2017 - LUKOIL has finished most of the construction works at the Vladimir Filanovsky field's Phase 2 development facilities and started drilling of the first...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Iran Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 |

More News

 

Oil & Gas Companies in Iran >>


Related Links

Gulf Oil and Gas
Copyright Universal Solutions All rights reserved. - Privacy Policy.