Gulf Oil and Gas accountACCOUNT

Genel Energy Completes Drilling at Taq Taq Field

Source: www.gulfoilandgas.com 12/23/2016, Location: Middle East

Share |
Genel Energy plc issues the following update in respect of the Taq Taq field (Genel 44% working interest). The third and final well of the 2016 Taq Taq drilling programme, TT-16y, has been successfully drilled and completed in the main Shiranish reservoir. The well is naturally flowing at c.8,000 bopd.

Gross Taq Taq production is currently c.40,000 bopd, with Q4 2016 averaging 45,000 bopd to date. The Pilaspi reservoir is being readied for production in January 2017, and is expected to contribute c.3,000 bopd.

The three Shiranish wells (TT-27x, TT-07z, and TT-16y) drilled in the 2016 campaign are currently producing a combined c.9,000 bopd. Discussions are ongoing between the Taq Taq partners over a potential workover of TT-07z. This well flowed on test at 5,000-9,000 bopd, although as a result of mechanical issues experienced during well completion activities TT-07z has recently been producing at 400 bopd.

Genel’s net working interest production from the Taq Taq and Tawke fields has averaged 53,500 bopd in 2016 to date. The updated Field Development Plan and the Competent Person’s Report for Taq Taq are on track for completion in Q1 2017. Genel plans to issue a trading and operations update in respect of 2016 financial and operating performance and 2017 outlook on Tuesday 24 January 2017.

Drilling News in Iraq >>

Colombia >>  10/19/2017 - Amerisur Resources Plc, the oil and gas producer and explorer focused on South America, is pleased to provide an operational update on activities in C...
Indonesia >>  10/16/2017 - JV partner Lion Energy reports that the South Block A PSC joint venture (Lion equity share: 40.7%) has formally approved drilling of the AMT-2 well to...

United States >>  10/16/2017 - From 1 September 2016 to 25 August 2017 we conducted an audit of ExxonMobil's activities relating to module-based drilling facilities and permanent pl...
United Kingdom >>  10/13/2017 - Angus Energy has successfully completed the drilling of the Lidsey-X2 production well. The Company will produce from a “net oil pay” section of 443 me...

Singapore >>  10/12/2017 - AkerBP has received consent to use Maersk Interceptor on the Tambar field for drilling and completion of wells 1/3-K-4 and 1/3-K-2.

...

Thailand >>  10/11/2017 - Tap Oil Limited provides the following update on the Manora Oil Field in the Northern Gulf of Thailand (TAP 30% interest). Mubadala Petroleum, Operato...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Iraq Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 |

Oil & Gas Projects in Iraq >>

More News

 

Oil & Gas Companies in Iraq >>


Related Links

Gulf Oil and Gas
Copyright © Universal Solutions All rights reserved. - Privacy Policy.