Gulf Oil and Gas accountACCOUNT

Construction of Well # 29 has Successfully Completed

Source: www.gulfoilandgas.com 12/6/2016, Location: Asia

Share |
SOCAR-AQS completes the works on construction of well #29, with target depth of 786 m, successfully, without any incidents and without harming the environment.

Our company attaches a great importance not only to drilling the wells in a short time period during its activities, but also to the provision of safety, protection of the environment and high quality of services during all stages of operation.

Drilling News in Azerbaijan >>

Brazil >>  2/16/2017 - Rosneft Brasil (100% owned Rosneft subsidiary) started the drilling of the first exploration well in the Solimoes Basin. Rosneft is commencing the nex...
Australia >>  2/15/2017 - Exploration in the Northern Territoryís Beetaloo Basin has progressed, with the fourth of five Stage 1 wells spudded. This follows the completion of e...

Norway >>  2/13/2017 - Lundin Petroleum AB (Lundin Petroleum) is pleased to announce that its wholly owned subsidiary Lundin Norway AS (Lundin Norway) has made an oil and ga...
Russia >>  2/13/2017 - The successful application of new technology in constructing multilateral wells has allowed Gazpromneft-Yamal (a Gazprom Neft subsidiary, currently de...

Trinidad and Tobago >>  2/13/2017 - LGO confirms that final approval was granted by the Forestry Department, to cut trees in order to clear the well sites for the impending two shallow i...
Oman >>  2/9/2017 - DNO ASA, the Norwegian oil and gas operator, announced a stepped up drilling campaign in the Kurdistan region of Iraq and the Sultanate of Oman on the...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Azerbaijan Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 |

More News

 

Oil & Gas Companies in Azerbaijan >>


Related Links

Gulf Oil and Gas
Copyright © Universal Solutions All rights reserved. - Privacy Policy.