Gulf Oil and Gas accountACCOUNT

Oryx Petroleum Announces Update on Operations

Source: www.gulfoilandgas.com 1/10/2017, Location: Middle East

Share |
Oryx Petroleum Corporation Limited announces an update on its operations. In December 2016, the Zey Gawra-1 well was side-tracked (referred to in this press release as the “Zey Gawra-1ST well”) and completed in open hole partially penetrating the Cretaceous reservoir in the Zey Gawra field. Production from the naturally flowing well is currently constrained to approximately 1,500 bbl/d of 35.5 degree API oil with a gas-oil ratio of approximately 3,000 scf/stb and less than 0.5% water, with more than 1,500 psi well head pressure.

The Corporation intends to continue the extended production test of the well with the objective of assessing the well’s performance, identifying options for increasing production and obtaining information to refine plans for future development of the Zey Gawra field.

Crude oil produced at the Zey Gawra field is currently hauled by tanker from Zey Gawra to the Hawler tanker terminal where it is offloaded and then pumped to the Demir Dagh storage system where it is blended with Demir Dagh crude oil before being exported through the Kurdistan Export Pipeline.

The drilling of the third well in the appraisal and initial development of the Zey Gawra field targeting the Cretaceous reservoir is planned in the second quarter of 2017.

Gross (100%) production from the Hawler license area averaged 3,100 bbl/d in the fourth quarter of 2016. Production from the Demir Dagh-3 well in the Jurassic reservoir, which was expected to decline in 2017, ceased in late December due to an abrupt increase in the water-oil ratio. The Corporation is reviewing the circumstances of the water breakthrough at the Demir Dagh-3 well to determine what remedial action, if any, may be attempted. The loss of production from the Demir Dagh-3 well has been offset by the addition of production from the Zey Gawra-1ST well. Current gross (100%) production from the Hawler license area is approximately 3,000 bbl/d.

A 3D seismic survey in the AGC Central license area is in progress and is expected to be completed before the end of January. Approximately 2,000 km2 of 3D seismic data will be acquired and the data will be processed and interpreted in the first half of 2017.

Drilling News in Iraq >>

Senegal >>  4/26/2017 - FAR Limited (FAR) and the Senegal Joint Venture are drilling the FAN South-1 exploration well into the Southern FAN prospect in the first pure explora...
United States >>  4/25/2017 - 88 Energy Limited (88 Energy,Operator) is pleased to provide an update on Project Icewine, located onshore North Slope of Alaska. ...

Russia >>  4/24/2017 - The first ever multi-hole “fishbone” well involving multiple horizontal branches has been drilled and commissioned at the Prirazlomnaya offshore rig —...
Colombia >>  4/21/2017 - Amerisur Resources Plc, the oil and gas producer and explorer focused on South America, is pleased to announce an update on operations in the Platanil...

Myanmar >>  4/20/2017 - Woodside Energy reports success at the Thalin-1B appraisal well (a re-entry and side-track of Thalin-1A) spudded in late February. The side-track was ...
India >>  4/19/2017 - Atlas Copco, a leading provider of sustainable productivity solutions, inaugurates an expanded manufacturing plant in India that will further boost pr...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Iraq Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 |

Oil & Gas Projects in Iraq >>

More News

 

Oil & Gas Companies in Iraq >>


Related Links

Gulf Oil and Gas
Copyright © Universal Solutions All rights reserved. - Privacy Policy.