Gulf Oil and Gas accountACCOUNT

PSIwms Supports Intralogistics Optimisation at Mahr

Source: www.gulfoilandgas.com 3/8/2017, Location: Europe

Share |
Mahr GmbH, a global manufacturer of production metrology, is relying on the PSIwms warehouse management system of PSI Logistics GmbH for warehousing in its central production supply and distribution warehouse at the company’s headquarters in Gottingen. As a long-standing cus-tomer of PSI, Mahr is already using the ERP system PSIpenta.

The logistics centre in Gottingen is one of five locations nationwide to have a stacker-operated high-bay warehouse, an automated small parts warehouse and an automated paternoster warehouse. These warehouses not only supply raw materials and semi-finished products to connecting production lines, they also store and distribute goods. This makes material flow correspondingly complex. Mahr has a long-standing tradition as a supplier to the automotive and automotive supplies industry, the electrical engineering, medical technology and aerospace sector, and mechanical engineering companies.

In implementing the new release 4.0 of PSIwms, Mahr aims to ensure the realignment of its product portfolio and enhancement of its products and services through a high-quality process. PSIwms will go a long way to harmonising the IT infrastructure of intralogistics in Gottingen – which is currently defined by multiple individual systems – and integrate automation system controls directly into a coordinated order production process via standardised interfaces. This also involves consolidating storage capacities and making intralogistics processes more efficient and dynamic.

All processes and capacity utilisation are made visually transparent thanks to a control centre and cockpit module in PSIwms. The integrated stacker control system acts as an in-house transport management system for optimising storage and retrieval in the high-bay warehouse. The system also paves the way for replacing document-based (picking) processes in order processing and increasing automation.

PSI Logistics was awarded the contract following a call for tenders; the commissioning is expected to take place in summer 2017.

Software >>

Software News in Germany >>

Austria >>  9/18/2017 - Based on the current global oil supply/demand balance, OPEC crude in 2017 was revised up by 0.2 mb/d from the previous report driven mainly by the upw...
Austria >>  8/28/2017 - The ORB recovered on bullish market fundamentals in July after two consecutive months of sharp declines. It was up almost 4% m-o-m but y-t-d was sligh...

Austria >>  8/24/2017 - Demand for OPEC crude for 2018 was revised up by 0.2 mb/d from the previous month. Within the quarters, the first quarter remained unchanged, while t...
Austria >>  8/22/2017 - After two months of average declines there was a recovery in oil prices in the second half of the month on improving signs of market rebalancing suppo...

Denmark >>  8/21/2017 - The Boards of Total and A.P. Moller – Maersk have both approved the acquisition of 100% of the equity of the E&P company Maersk Oil & Gas A/S (Maersk ...

Related Categories: Bid and Proposal Software  CAD Systems  Control Software  Design Software  e-business  Financial Accounting Software  Gas Software  General  GIS Software  Import Documentation System  Materials Management Software Materials Management  Oil Software  Petroleum Software  Process Simulation  Procurement Software  Property Management Software  Risk Management  Sales automation Software 

Related Articles: Bid and Proposal Software  CAD Systems  Control Software  Design Software  e-business  Financial Accounting Software  Gas Software  General  GIS Software  Materials Management Software Materials Management  Oil Software  Petroleum Software  Process Simulation  Procurement Software  Property Management Software  Risk Management 


Germany Oil & Gas 1 >>  2 | 3 | 4 |

More News

 

Oil & Gas Companies in Germany >>


Related Links

Gulf Oil and Gas
Copyright © Universal Solutions All rights reserved. - Privacy Policy.