Gulf Oil and Gas accountACCOUNT

First Turbine Installed at Rampion

Source: www.gulfoilandgas.com 3/13/2017, Location: Europe

Share |
The construction of Rampion Offshore Wind Farm enters into its final phase. At the weekend the first of 116 wind turbines was installed for the project based in the English Channel off the coast of Sussex.

For the installation each tower with a length of 80 metres, weighing approximately 200 tonnes, is positioned and bolted onto each turbine foundation. Next the nacelle, which houses the generator and gearbox, is fitted onto the tower, and finally the three blades, each measuring 55m in length, are hoisted and connected one at a time.

During spring, offshore cabling work will continue. Onshore construction of the Operations and Maintenance (O&M) base at Newhaven Port will commence in March. The O&M base will include offices and warehousing and will employ up to 60 full time, permanent staff and store spare parts and tools to support the maintenance of the turbines.

The 400MW project being built by E.ON, the UK Green Investment Bank plc and Canadian energy company Enbridge, will, when complete provide enough electricity to supply almost 347,000 homes a year, equivalent to around half the homes in Sussex. The project is due to be completed and fully operational in 2018.

Turbines (General) News in United Kingdom >>

Ireland >>  6/14/2018 - CGG has completed the Pre-Stack Time Migration (PSTM) of its 2,500-sq-km Dunquin multi-client survey acquired in Block 44 of the Porcupine Basin, west...
Germany >>  6/12/2018 - Siemens and industrial service provider Bilfinger SE have decided to step up their cooperative association, as Bilfinger drives forward digitalization...

Spain >>  6/4/2018 - Repsol has announced that it is working with Google Cloud to launch a project that will use big data and artificial intelligence to optimize managemen...
Norway >>  5/31/2018 - Aker BP, on behalf of the Wellhead Platform Alliance, has awarded PG Flow Solutions a contract to supply a number of pump systems to the Valhall Flank...

United Kingdom >>  5/31/2018 - Aberdeen-based international offshore diving consultancy DiveSource has secured three new contracts in the last six months worth a total of £4 million...
United Kingdom >>  5/30/2018 - Aberdeen-based Seacroft Marine Consultants Limited has been awarded a marine consultancy contract in the UKCS by energy company TAQA. ...

Related Categories: Diesel Engine  Engine Parts  General  Generating Sets  Generators  Marine Diesel Engine  Power Pack  Turbines (General)  Turbines: Gas  Turbines: Hydro  Turbines: Steam 

Related Articles: Diesel Engine  Engine Parts  General  Generating Sets  Generators  Marine Diesel Engine  Power Pack  Turbines (General)  Turbines: Gas  Turbines: Hydro  Turbines: Steam 


United Kingdom Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 |

More News

 

Oil & Gas Companies in United Kingdom >>


Related Links

Gulf Oil and Gas
Copyright © Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.