Gulf Oil and Gas accountACCOUNT

Masirah Oil Spuds Exploration Well in Block 50 Oman

Source: www.gulfoilandgas.com 3/17/2017, Location: Middle East

Share |
Masirah Oil Limited (“Masirah”) and its partners announced that the drilling of exploration well Karamah#1 in Block 50 Oman has started on 17 March 2017.

The prospect Karamah is targeted for a depth of about 3 km, and is located on a structural closure approximately 13 km away from the earlier GAS-1 discovery well at a water depth of 23 metres. The well objective is to explore multiple target horizons of the Early Tertiary and Late Cretaceous formations.

The well location was selected by integrating mainly the geological understanding and the proprietary multi-attribute Rex Virtual Drilling technology. The well is being drilled using the independent leg cantilever jack-up drilling rig Aban VII which was also used in earlier Masirah drilling campaigns. The shareholders of Masirah are Rex Oman Ltd at 85.15 per cent, Schroder & Co Banque S.A. at 5.00 per cent, Lime Petroleum Plc with effective shareholding at 1.45 per cent and Petroci Holdings at 8.39 per cent.

Drilling News in Oman >>

Indonesia >>  10/16/2017 - JV partner Lion Energy reports that the South Block A PSC joint venture (Lion equity share: 40.7%) has formally approved drilling of the AMT-2 well to...
United States >>  10/16/2017 - From 1 September 2016 to 25 August 2017 we conducted an audit of ExxonMobil's activities relating to module-based drilling facilities and permanent pl...

United Kingdom >>  10/13/2017 - Angus Energy has successfully completed the drilling of the Lidsey-X2 production well. The Company will produce from a “net oil pay” section of 443 me...
Singapore >>  10/12/2017 - AkerBP has received consent to use Maersk Interceptor on the Tambar field for drilling and completion of wells 1/3-K-4 and 1/3-K-2.

...


Thailand >>  10/11/2017 - Tap Oil Limited provides the following update on the Manora Oil Field in the Northern Gulf of Thailand (TAP 30% interest). Mubadala Petroleum, Operato...
Malaysia >>  10/10/2017 - Semi-submersible Maersk Deliverer has been awarded a new contract by JX Nippon with an estimated duration of 30 days. The contract covers the drilling...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Oman Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 |

Oil & Gas Projects in Oman >>

More News

 

Oil & Gas Companies in Oman >>


Related Links

Gulf Oil and Gas
Copyright © Universal Solutions All rights reserved. - Privacy Policy.