Gulf Oil and Gas accountACCOUNT

Alstom Inaugurated First Locomotive Repairing Centre in Kazakhstan

Source: www.gulfoilandgas.com 7/21/2017, Location: Asia

Share |
Alstom has inaugurated its first repairing centre in Astana, Kazakhstan. The corrective and overhaul preventive works, including spare parts and repairing of traction and brake systems, for the Prima T8 (KZ8A) and Prima M4 (KZ4AT) locomotives will be performed there for a period of 25 years.

“The inauguration of the first repairing centre in Kazakhstan is a very important milestone for Alstom in the country. Through implementation of new technology and developing local expertise, we are proud to get Kazakhstan’s industrial base to a new level, which opens new promising prospects for the country as an important hub linking Europe, Middle East, Asia and Russia through new Silk Way. Being the only repairing centre for modern traction and braking system in the Central Asian region, Alstom strengthens its long presence, developing local competencies, contributing to the economic development of Kazakhstan and opening new opportunities for export in neighbouring countries”, said Bernard Peille, Managing Director of Alstom in CIS.

With a total surface area of 2,660m2, the repairing centre comprises a repair and testing shop, warehouse, a spare parts shop and office space. The teams will be able to maintain products manufactured by Alstom, as well as equipment produced by other companies, such as pantographs, transformers and braking systems. The number of employees will grow from 18 including engineers and administrative staff today to 30 by the end of 2020.

Alstom is present in Kazakhstan with more than 600 people, two Joint Ventures and two plants, one in Astana for locomotives manufacturing and maintenance; and KazElectroPrivod in Almaty for the production of point machines. Alstom is the only manufacturer of electric locomotives and point machines in the Central Asian and Caucasian region and a major contributor to the revitalisation of its rail industry and the development of its economy.

With 14,000 km of track, the Kazakh railway network is the world’s third biggest network using the 1,520 mm track gauge and represents a substantial market for maintenance activities.

Transportation and Vehicles News in Kazakhstan >>

Malaysia >>  11/16/2017 - ET Energy, a global leading clean energy developer and operator has announced that the company together with its partner Northwest Electric Power Desi...
India >>  11/8/2017 - WorleyParsons has been awarded a contract by Reliance Industries for project management consultancy (PMC) services for development of the R-Series gas...

Japan >>  11/6/2017 - The declining trend seen earlier in Japan continued, with crude oil imports dropping in August by 145 tb/d, or 4%, to average 3.2 mb/d. Y-o-y, crude i...
Malaysia >>  11/3/2017 - TechnipFMC (FTI) has been awarded a subsea contract by Murphy Sabah Oil for the Phase 1A Block H Gas Development Project. The project is located in of...

Azerbaijan >>  11/2/2017 - Trans Adriatic Pipeline (TAP) AG has selected PSI Software AG as the provider of the Commercial Dispatching Software (CDS). The PSI software will enab...
China >>  11/2/2017 - The latest information for China showed that total commercial oil inventories fell by 9.3 mb in August for the second consecutive month to settle at 3...

Related Categories: Barges  Boats  Commercial Vehicles - Trucks  Float Equipment  Flotation Cells  General  Helicopter  Passenger Cars  ROV  Tires  Vehicle Parts 

Related Articles: Barges  Boats  Float Equipment  General  Helicopter  ROV  Tires  Vehicle Parts 


Kazakhstan Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 |

More News

 

Oil & Gas Companies in Kazakhstan >>


Related Links

Gulf Oil and Gas
Copyright © Universal Solutions All rights reserved. - Privacy Policy.