Gulf Oil and Gas accountACCOUNT

Preliminary Results for the A1 Prospect in Tendrara-Lakbir Permit

Source: www.gulfoilandgas.com 4/26/2018, Location: Africa

Share |
Sound Energy, the Morocco-focused upstream gas company, is delighted to announce receipt of the preliminary volume results of the Competent Person's Report (CPR) in relation to the A1 prospect in the Company's Tendrara-Lakbir permit, Eastern Morocco.

The CPR is being conducted by RPS Energy Consultants Ltd (RPS) and is the first in a series of CPRs planned across the Company's Eastern Morocco acreage following the acquisition of new 2D seismic.

Sound Energy is pleased to report that these preliminary volume results largely confirm the Company's previously communicated GOIP estimates for the TAGI reservoir in the A1 prospect (RNS on 8 February 2018 estimated 0.4 Tcf Low case, 0.7 Tcf Mid case and 1.2 Tcf High case GOIP for the TAGI reservoir in A1).

The Company intends that TE9, the first well, targets both the TAGI and the deeper Paleozoic. The scope of the CPR was designed to only cover the Triassic TAGI reservoir and any future volume estimates for the deeper Paleozoic prospectivity, will need to be added to these volumes.

The table below summarises the preliminary results of the CPR evaluated by RPS for the A1 prospect:

Prospect: A1 TAGI reservoir
Undiscovered Gas Originally In Place (Bcf)
Gross (100%) basis
Low:278
Mid:624
High:1254
Mean:712
Chance of Success (%): 25

The Company believes that further work may de-risk the first well and the chance of success may increase on positive results from the seismic processing and geological studies.

The CPR, which is expected to be issued in final form during May 2018, will include a full technical review of the A1 prospect. The A1 prospect evaluation uses new 2D seismic data acquired by Schlumberger Western Geco, as part of the previously communicated Phase 1 seismic acquisition programme. The data were recorded in late 2017 and early 2018 and were fast-track processed by the specialist geophysical contractor, Shearwater Geoservices Ltd. The final CPR in relation to the A1 prospect will be compliant with the latest SPE Petroleum Resources Management System ("PRMS") approved definitions of Reserves and Resources.

Following finalization of the prospect volumes and the chance of success, the Company intends to secure partner approvals and commence ground works.

This announcement is inside information for the purposes of Article 7 of Regulation 596/2014.



Reservoir Engineering & Recovery Methods News in Morocco >>

Russia >>  9/18/2018 - PAO NOVATEK announced that upon drilling and testing of well #294 at the Utrenneye field, two new hydrocarbon deposits were discovered and commercial ...
Guyana >>  9/11/2018 - Eco (Atlantic) Oil & Gas Ltd., the oil and gas exploration company with licences in highly prospective regions in Namibia and Guyana, is delighted to ...

Russia >>  9/11/2018 - The Federal Agency for Mineral Resources has confirmed hydrocarbon reserves at Gazprom Neft’s Neptune field, located offshore from Sakhalin Island in ...
Norway >>  8/24/2018 - Digital technology developed in Norway will help improve recovery from the Johan Castberg field in the Barents Sea. Equinor has awarded Alcatel Submar...

Related Categories: Formation Evaluation  General  Geological, Geophysical  Geophysical Contractors  Mud Logging  Reservoir Engineering & Recovery Methods  Seismic survey  Well Completion, Logging, Workover 

Related Articles: Formation Evaluation  General  Geological, Geophysical  Geophysical Contractors  Mud Logging  Reservoir Engineering & Recovery Methods  Seismic survey  Well Completion, Logging, Workover 


Morocco Oil & Gas 1 >>  2 | 3 | 4 | 5 |

Oil & Gas Projects in Morocco >>

More News

 

Oil & Gas Companies in Morocco >>


Related Links

Gulf Oil and Gas
Copyright © Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.