Gulf Oil and Gas accountACCOUNT

TransGlobe Energy Announces Operations Update in Egypt

Source: www.gulfoilandgas.com 4/27/2018, Location: Africa

Share |
TransGlobe Energy Corporation (TGL) (TGA) (“TransGlobe”) announces an operations update for Egypt.

Operations Update Egypt
The Company has completed drilling the second South K-field development well at K-45 which was targeting the main Asl A sand in a crestal position in South K-field. The well was drilled to a total depth of 5,831 feet and encountered main Asl A sand approximately 66 feet structurally higher than the K-46 well and is structurally the highest well in South K-field Asl A & B pools. K-45 encountered an internally estimated 195 feet of net oil pay comprised of 120 feet of net oil pay in the Asl A pool (A1, A2 and A3), and 75 feet of net oil pay in the Asl B pool. The Company plans to initially complete the Asl B formation in K-45 and place the well on production in early May.

Following K-45, the drilling rig is scheduled to move to West Gharib and NW Gharib to drill Arta 54 and NWG 38A-3 respectively. Arta 54 is targeting the Nukhul/Red bed formation at the northern edge of the main Arta pool. The NWG 38A-3 well is planned as a water injection well to provide reservoir pressure support and enhanced recovery in the NWG 38 Red Bed pool. The first three wells drilled in the NWG 38 pool did not encounter a water leg and are currently producing at a combined, restricted rate of approximately 920 Bopd. It is expected that the current production rates will be optimized upon completion of the water injection scheme and stabilized reservoir pressures.

Following NWG 38A-3, the rig will return to the West Bakr concession and drill up to three development wells including two wells inside the recently negotiated reduced buffer zone targeting the M-field Asl A formation.

For more information about related Opportunities and Key Players visit Egypt Oil and Gas Projects

Drilling News in Egypt >>

Norway >>  7/18/2018 - The Petroleum Directorate has granted Equinor Energy AS a drilling permit for wells 35/10-4 S, 35/10-4 A and 35/10-4 B, cf. Section 15 of the Resource...
Australia >>  7/13/2018 - Carnarvon Petroleum Limited provides the following update on the drilling of the Dorado-1 well. ...

Norway >>  7/10/2018 - Hundreds of workers on Norwegian oil and gas offshore rigs will go on strike on Tuesday after rejecting a proposed wage deal, a state-appointed mediat...
Indonesia >>  7/6/2018 - Range Resources has provided an update on the operations at the Perlak field, located in Northern Sumatra, Indonesia. As previously announced, the ope...

Norway >>  7/6/2018 - A/S Norske Shell, operator of production licence 373S, has completed the drilling of wildcat well 34/5-2 S. The well is dry. The well was drilled abou...
Egypt >>  7/5/2018 - Rockhopper Exploration plc (RKH), the oil and gas exploration and production company with key interests in the North Falklands Basin and the Greater M...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Egypt Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 |

Oil & Gas Projects in Egypt >>

More News

 

Oil & Gas Companies in Egypt >>


Related Links

Gulf Oil and Gas
Copyright © Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.