Gulf Oil and Gas accountACCOUNT

MX Oil Updates on the Aje Field

Source: www.gulfoilandgas.com 5/1/2018, Location: Africa

Share |
MXO plc, the oil and gas investing company listed on AIM, is pleased to provide an update with regard to OML 113, the offshore licence in Nigeria, in which it has an investment. The Aje Field within the OML 113 licence area commenced production in 2016. On 5 February 2018, the Company announced that it would be updating its Competent Persons Report ("CPR") as a result of the production data that had been generated to date. The Company is pleased to announce the results from the updated CPR.

There have been significant developments in the Aje project over the past two years that have had a material impact on the project's reserves and resource position. Since the last CPR in July 2014, three new Cenomanian penetrations have been drilled (Aje-5, Aje-5ST1 and Aje-5ST2), with production coming on-stream from the Cenomanian reservoir in May 2016 and from the Turonian oil rim in May 2017. A field development plan for the Turonian Aje gas project ("FDP") was submitted to the Nigerian Government for consideration in 2017. The FDP comprises four to five production wells in the Turonian, tied back to existing and new infrastructure.

The revised CPR has been completed by AGR TRACS International Limited ("AGR TRACS"). This is an update to the CPR prepared by them in July 2014 and incorporates all developments and new data generated by the project since that date.

The level of reserves have increased significantly since the 2014 CPR.

These estimates of reserves have been derived based on an oil price assumption of US$60/bbl flat Real Terms and a gas price assumption of US$4.00/Mscf flat Real Terms. Condensate is assumed to achieve the same price as oil and LPGs 65% of the oil price expressed in US$/bbl.

AGR TRACS has also certified gross 1C Unrisked Contingent Resources of 4 MMboe, 2C Unrisked Contingent Resources of 9 MMboe and 3C Unrisked Contingent Resources of 17.5 MMboe. MX Oil's net entitlement is respectively 1C Unrisked Contingent Resources of 0.20 MMboe, 2C Unrisked Contingent Resources of 0.45 MMboe and 3C Unrisked Contingent Resources of 0.88 MMboe. All these Contingent Resource volumes are expressed as unrisked technically recoverable volumes without any economic cut-off, as the development plans are still in progress.

The recent performance of the Aje-5ST2 well completed on the Turonian oil rim has encouraged the Aje partnership to consider a more extensive development of this oil rim. Since the Aje Gas FDP was completed and submitted ahead of this well coming on line, AGR TRACS has only been able to recognise contingent resources associated with four horizontal wells proposed as a Phase 2 development in that plan. The encouraging production performance for the Aje-5ST2 well so far provides a strong incentive for further studies to better understand how the oil rim can be optimally developed.

These results confirm the commerciality of the Aje gas development, highlight the need for a revision to the development plan once the oil rim studies are completed and will underpin a final investment decision on the development of the Turonian reserves in the future.

MX Oil's classification of reserves and resources are based on the definitions set by the Petroleum Resources Management System (PRMS-2007), sponsored by the Society of Petroleum Engineers/World Petroleum Council/American Association of Petroleum Geologists/Society of Petroleum Evaluation Engineers (SPE/WPC/AAPG/SPEE) as issued in March 2007.

Stefan Oliver CEO said:
"The revised CPR clearly demonstrates the potential of the Aje Field and the level of resources and reserves that are potentially available. I look forward to updating the market as the various studies underway progress."

For more information about related Opportunities and Key Players visit West Africa Projects

Reservoir Engineering & Recovery Methods News in Nigeria >>

Egypt >>  5/14/2018 - Last week, the Minister of Energy of Cyprus, Mr. George Lakkotrypis, and the Minister of Petroleum and Mineral Resources of Egypt, Eng. Tarek El Molla...
Libya >>  5/13/2018 - Libya’s offshore Bahr al-Salam gas field has resumed operations with production of 380 million cubic feet per day, state firm NOC said after completin...

Egypt >>  5/10/2018 - Eni announces the start-up of the third production unit (T-2) of the Zohr project, increasing the installed capacity to 1.2 bcfd. Zohr is now producin...
Egypt >>  5/3/2018 - Eni announces an oil discovery on the A-2X exploration prospect located in South West Meleiha license, in the Egyptian Western Desert, some 103 Km Nor...

Morocco >>  5/2/2018 - Shearwater GeoServices (Shearwater) has been awarded a contract to acquire 3D seismic for Genel Energy in the Sidi Moussa license offshore Morocco. Ad...

Related Categories: Formation Evaluation  General  Geological, Geophysical  Geophysical Contractors  Mud Logging  Reservoir Engineering & Recovery Methods  Seismic survey  Well Completion, Logging, Workover 

Related Articles: Formation Evaluation  General  Geological, Geophysical  Geophysical Contractors  Mud Logging  Reservoir Engineering & Recovery Methods  Seismic survey  Well Completion, Logging, Workover 


Nigeria Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 |

Oil & Gas Projects in Nigeria >>

More News

 

Oil & Gas Companies in Nigeria >>


Related Links

Gulf Oil and Gas
Copyright © Universal Solutions All rights reserved. - Privacy Policy.