Turaif Shale Gas Project (System A)

Shale Gas - Execution


Location  Turaif City - Saudi Arabia
Announced  8/20/2015
Scope  Saudi Aramco plans to start production of shale gas in Turaif in the northern part of Saudi Arabia where the big mining project Waad al-Shamal is under development. This project will involve 10 wellheads, 10 two-kilometre, 6-inch flowlines, scraping facilities and a metering station. A gas-gathering facility will also be built, which will include an inlet manifold, high- and low-pressure inlet separators, compressors and a dehydration unit. A pipeline connecting the gas-gathering centre to Waad al-Shamal will also be built. At Waad al-Shamal, a control centre will be built, along with process and control equipment. Enough space will be left to accommodate four more gas-gathering centres in the future. All the surface facilities are also expected to be skid-mounted, meaning they can be transferred elsewhere when the reservoirs have depleted. Capacity at the gas gathering facilities is set to come in a 66 million cubic feet per day of gas, up from 50 MMcfd when the project was first put out to tender.
Key Vendors & Service Providers
Owners and Shareholders
Project Developers
Engineering & Consulting
Contractors
Product Vendors
United States
United States
United States
United States
Canada
United States
United States
Canada
Canada
United States
United States
United States
United States
Gulf Oil and Gas
Copyright Universal Solutions All rights reserved. - Privacy Policy.