Enhanced Oil Recovery 2012

27-28 March 2012. Organized by Fleming Gulf FZ LLC
Geological and Geophysical: Reservoir Engineering & Recovery Methods
Location: United Arab Emirates Abu Dhabi
Date: 3/27/2012


Organizer: Fleming Gulf FZ LLC
Tel: 0091 20 66070063
Fax: 0091 20 66070061


Share |
EOR will play a key role in the future long term supply of oil to meet world demand. Conventional resources are maturing and the industry is experiencing limited volumes of discoveries of new conventional resources to replace production. At the same time, the growth in demand for oil is increasing at a steady pace with emerging economies dominating the world markets.

Using EOR, 30-60 % or more of the reservoir's original oil can be extracted compared to 20-40% using primary and secondary recovery. If EOR is implemented across the world, the crude oil extract rate goes up to 60%, which means we can extend the current shelf life of the remaining 46 years to 138 years.


Geological and Geophysical: Reservoir Engineering & Recovery Methods


Gulf Oil and Gas
Copyright © 2023 ICT All rights reserved. - Terms of Service - Privacy Policy.