Valmet to deliver steam turbine automation to Energie AG in Austria

Source: www.gulfoilandgas.com 4/3/2024, Location: Not categorized

Valmet will deliver a steam turbine control system to Energie AG’s waste recycling plant in Wels, Austria. The company is migrating the current turbine controls to Valmet DNA automation system in order to have a fully integrated control system for the whole plant. This will also bring better visibility for the whole process, easier and more efficient operations and troubleshooting.

The order is included in Valmet’s orders received of the first quarter 2024. The value or the order is not disclosed. The delivery will take place in April 2024 and the planned turbine start-up is scheduled for June 2024.

“Valmet’s automation system’s high reliability and proven availability combined with our experience of Valmet’s local Austrian team met our distinctive quality requirement and led to this order. In addition, Valmet’s long experience in automation and process technology paired with sustainability and reliability convinced us,” says Günther Gruber, Power Plant Manager, Energie AG.

“We have built an excellent relationship with Energie AG over the past 18 years by providing them with advanced automation solutions and a wide range of lifecycle services to their two waste incineration lines. With this second turbine running with Valmet’s automation solution, the customer will reach a maximum level of system integration and already known Valmet DNA advantages,” says Mustafa Began, Service Area Manager, Automation, Valmet.

Technical information about the delivery
Valmet’s delivery for the 23.5 MW steam turbine includes redundant Valmet DNA turbine control with new turbine protection system and new overspeed protection system. The Valmet DNA Steam Turbine Automation system offers convenience together with the thoroughness of a fully integrated system. It is suitable to control steam turbines of any brand with any power output.


Scotland >>  5/16/2024 - Full Circle has signed a new, long-term, O&M contract with Zephyrus Green Energy, a Scottish-based renewable energy developer with the assistance of G...
Germany >>  5/9/2024 - - The turbine is the first of 50 to be installed at 476 MW Baltic Eagle wind farm.
- A joint venture between Iberdrola and Masdar, Baltic Eag...


Ireland >>  5/8/2024 - Codling Wind Park invites you to visit the team at Ireton’s shop, Killincarrick Road, Greystones.
Open from 11-3 pm daily on Wednesdays and Thur...

United States >>  5/2/2024 - The Nordex Group has received an order for N149/5.X turbines from the United States and will be supplying 25 of its Delta 4000 series models. The turb...




Gulf Oil and Gas
Copyright © 2023 ICT All rights reserved. - Terms of Service - Privacy Policy.