Highlights
• Alameda (“N”) sheet reservoir cores obtained: first core taken at 3210 mMD, second core
taken at 3310 mMD; core samples of good quality.
• Cores will be analysed in conjunction with well logs and test results, when obtained, to
better define petrophysical properties, reservoir characteristics, fracture density and
nature, intergranular porosity, permeability, deliverability, and reservoir fluid composition.
• Forward plan is to run into hole with Bottom Hole Assembly and drill 8 ½” hole to section
Total Depth prognosed at 3586 mMD.
• Once TD is reached plan is to set 7” production liner with open annulus and external
casing packers to isolate up to 3 zones within the Alameda Reservoir interval.