China Petroleum Network News (Special Correspondent Wang Danling, Correspondent Li Rui) In mid-July, the geothermal test well Anre 1 well, located in Anxin County, Xiong'an New Area, implemented by Huabei Oilfield, was officially drilled. The designed well depth of Anre 1 well is 4,500 meters, which is the deepest geothermal well in Hebei Province and has exploratory significance for the construction of ecological Xiong'an and green Xiong'an.
Since the beginning of this year, North China Oilfield has unswervingly taken the path of ecological priority and green development, continuously expanded the green energy industry, accelerated the development of new quality productivity, promoted the green transformation of production methods, and helped achieve carbon peak and carbon neutrality. Especially in promoting the use of geothermal energy, North China Oilfield has actively expanded the market in Beijing and central Hebei (Xiong'an) to create a "main attack team" for geothermal utilization in Beijing, Tianjin and Hebei. In order to actively develop the Xiong'an geothermal market, North China Oilfield is based on the two-dimensional and three-dimensional seismic data of PetroChina in Anxin County in the early days, quickly implements structural characteristics and stratigraphic distribution, scientifically compiles geothermal utilization and development plans, carefully prepares drilling work, and accelerates the construction of a demonstration model of geothermal projects in Xiong'an New Area.
According to the preliminary resource evaluation of Huabei Oilfield, the total geothermal resource reserves in Anxin County reach 2.06 billion GJ, and the total geothermal water volume is 274 million cubic meters. In accordance with the plan of Xiongan New Area to build a model of green city development, Huabei Oilfield designed and deployed two geothermal exploration wells, Anre 1 and Anre 2, which can heat 330,000 square meters of buildings such as schools, residences, and government office buildings within 1,000 meters.