Solar Power Plants through NTPC

Source: www.gulfoilandgas.com 8/1/2024, Location: Asia

NTPC Renewable Energy Limited (NREL), a subsidiary of NTPC Ltd., is executing a Solar Project having a capacity of 630 MW at Barethi (District-Chhatarpur) in Khajuraho Lok Sabha Constituency under Engineering, Procurement & Construction (EPC) mode sanctioned by the Ministry of New & Renewable Energy (MNRE) under the Solar Parks scheme.

The Land for the development of the project has been transferred to NREL. Notice Inviting Tender (NIT) for EPC Package and Pooling Substation Package have been issued by NREL and Tender is expected to be awarded by September, 2024. The expected date of completion of the project is March, 2026.

This information was given by the Minister of State for Power, Shri Shripad Naik, in a written reply in the Lok Sabha today.


United States >>  9/11/2024 - Enlight Renewable Energy (“Enlight”, "the Company”, NASDAQ: ENLT, TASE: ENLT.TA), a leading renewable energy platform, announces the initial start of ...
Australia >>  9/10/2024 - OX2 has sold two solar projects in Australia with combined capacity of 137 MWp / 105MW ac. The transaction will be recorded in the third quarter 2024....

Brazil >>  9/10/2024 - From August 27th to 29th, Antaisolar showcased its innovations at the Intersolar S.A. Exhibition in São Paulo. During the exhibition, Antaisolar unvei...
Colombia >>  9/10/2024 - IDB Invest, Bancolombia, and Atlas Renewable Energy, a global leader in clean energy generation, have strengthened their commitment to mitigating clim...

Germany >>  9/10/2024 -  Hamburg-based wind and solar park operator Encavis AG, listed on the MDAX of Deutsche Börse AG (Prime Standard; ISIN: DE0006095003; ticker symbol: EC...
Germany >>  9/10/2024 - Hamburg-based wind and solar park operator Encavis AG, listed on the MDAX of Deutsche Börse AG (Prime Standard; ISIN: DE0006095003; ticker symbol: ECV...




Gulf Oil and Gas
Copyright © 2023 ICT All rights reserved. - Terms of Service - Privacy Policy.