Gulf Oil and Gas accountACCOUNT

Centurion provides an update on the drilling campaigns in Tunisia

Source: www.gulfoilandgas.com 4/20/2005, Location: Africa

Mellita Exploration Concession

As operator of the Mellita farmout block, Petro Canada has advised that the on shore oil prospect Midoun-1 well on Djerba Island is scheduled to spud by end of April. The well is targeting the Meloussi Sands at a depth of approximately 2800 meters. The well is expected to take approximately 40 days to reach total depth.

Drilling News in Tunisia >>

Australia >>  5/21/2019 - JV partner Carnarvon Petroleum has provided an update on the drilling of the Santos-operated Dorado-2 well. Since the last report the 12-1/4” hole has...
Egypt >>  5/21/2019 - Dana Gas PJSC, the Middle East's largest regional private sector natural gas company, has commenced drilling operations on 20 May at its Merak-1 well,...

Norway >>  5/15/2019 - Norway's Petroleum Safety Authority has given Aker BP consent to drill exploration well 15/6-16 S, with options for a sidetrack and testing. The well ...
Colombia >>  5/14/2019 - Amerisur Resources, the oil and gas producer and explorer focused on South America, has provided an update on operations in Colombia ahead of its annu...

Norway >>  5/14/2019 - The Norwegian Petroleum Directorate has granted Lundin Norway a drilling permit for wildcat well 16/1-31 A in production licence PL 338. Well 16/1-31 ...
Scotland >>  5/14/2019 - Siccar Point Energy (‘Siccar Point’) has completed drilling the Blackrock exploration well 204/5b-2 in the West of Shetland. The well was drilled wit...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Tunisia Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 |

Oil & Gas Projects in Tunisia >>

More News

Related Links

AO BJ BW CD CG CI CM DZ EG ET GA GH GM GN GQ GW KE LR LY MA MG ML MR MZ NA NE NG RW SC SD SL SN SO ST SZ TD TN TZ UG ZA ZM
Gulf Oil and Gas
Copyright © Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.