Tullow Oil Plugs and Abandons Gharabi-1 Well

Source: www.gulfoilandgas.com 2/16/2011, Location: Africa

Tullow Oil plc (Tullow) announces that the Gharabi-1 well, located in Block 6 offshore Mauritania, was unsuccessful and has been plugged and abandoned.

The well, drilled by the Maersk Deliverer in water depths of 1,787 metres to a total depth of 4,433 metres, intersected poorly developed water-bearing reservoirs. Gharabi-1 was drilled by the Operator Petronas to meet a commitment on the block and the result has no impact on Tullow's future plans for its Mauritanian acreage. In Block 6, Tullow (22.4%) is partnered by Petronas (72.6% operator) and Roc Oil (5%).


Norway >>  8/12/2022 - Aker BP ASA, operator of production licence 941, has concluded the drilling of wildcat well 6507/3-15.

The well was drilled about 14 km nor...

Norway >>  8/9/2022 - The Petroleum Safety Authority Norway has given Equinor consent for exploration drilling in block 6507/8 in the Norwegian Sea.

Operator: E...


Guyana >>  8/5/2022 - The drilling of the Beebei-Potaro exploratory well, located in the Kanuku licence, off the coast of Guyana, has been finished, according to Tullow Oil...
Australia >>  8/4/2022 - - 21 stages were stimulated, which is the greatest number of stimulation stages in a single well in the Beetaloo to date
- Delivered 927m of st...


Romania >>  8/4/2022 - Serinus Energy plc ("Serinus") (SEN), is pleased to announce that the drilling of the Canar-1 exploration well in Romania commenced.

...

Norway >>  8/3/2022 - The Norwegian Petroleum Directorate (NPD) has granted Equinor a drilling permit for well 6507/8-11 S in production licence PL 124.

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Gulf Oil and Gas
Copyright 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.