Gulf Oil and Gas accountACCOUNT

Cabinet Directs Placing IP Project on Fast Track

Source: www.gulfoilandgas.com 1/11/2012, Location: Asia

The Cabinet has directed the Ministry of Petroleum and Natural Resources to undertake the Iran-Pakistan (IP) gas pipeline project on fast track basis, and reduce unaccounted for gas (UFG) losses from 12 percent to 6 percent.

The Cabinet was informed on January 3, 2012 that the current gas production in the country is over 4 billion cubic meters per day, whereas the demand is over 6 billion cubic meters, Iran's SHANA news agency reported.

The Ministry of Petroleum and Natural Resources has announced to formulate a comprehensive energy roadmap that would be finalised in six months.

Pakistan's petroleum minister Dr Asim Hussain said that the government is working on a roadmap to cater to gas shortage in the country.

He went on to say that, the work on the roadmap is in progress and expected to be completed within six months. It's worth mentioning that by endorsement of the contract between two countries (Iran and Pakistan) Iran is responsible for natural gas export to Pakistan from 2014 in amount of 21/5 million cubic meters daily, and 7/8 billion cubic meters annually.

Special Report

Pipe Lines Installations News in Iran >>

Indonesia >>  7/17/2019 - Mubadala Petroleum announces that it has signed an agreement with Premier Oil to farmout a 20 percent participating interest in each of the Andaman I...
Russia >>  7/15/2019 - Global drilling and engineering contractor KCA Deutag KCAD) is delighted to announce that its land drilling operation has won three new contracts in R...

Russia >>  7/9/2019 - From 16 July to 30 July 2019, Nord Stream AG will temporarily shut down both lines of its gas pipeline system for routine maintenance works. The maint...
Kazakhstan >>  7/5/2019 - The Kazakh Ministry of Energy, KazMunayGas (KMG) and Eni signed a protocol of direct negotiations to grant the subsoil use right for exploration and p...

Russia >>  7/3/2019 - On July 1, the Gazprom Group signed a five-year contract to purchase natural gas from Turkmengas (for the period through June 30, 2024). According to ...
India >>  7/2/2019 - McDermott International, Inc. has completed the first of two offshore campaigns for Reliance Industries Ltd. KG-D6 R-Cluster subsea field development,...

Related Categories: Civil Works  Civil Works - Finishing works  Construction Contractors  Electrical Works  Engineering Procurement and Construction (EPC)  Engineering Procurement and Construction Management (EPCM)  General  Mechanical Works  Pipe Lines Installations  Steel Works 

Related Articles: Civil Works  Civil Works - Finishing works  Construction Contractors  Electrical Works  Engineering Procurement and Construction (EPC)  Engineering Procurement and Construction Management (EPCM)  General  Mechanical Works  Pipe Lines Installations  Steel Works 


Iran Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 |

Oil & Gas Projects in Iran >>

More News

Related Links

AZ BD BN CN GE HK ID IN IR JP KR KZ MM MN MY PG PH PK RU SG TH TJ TM TW UA UZ VN
Gulf Oil and Gas
Copyright © Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.