On 19th January 2012 Harouge Oil Operations’ Naga field has returned to its 8,000 barrels per day (bpd) production, which was shipped from the port of Sidra.
The oil production at Naga brought the overall daily production at Harouge Oil Operation to 81,000 bpd, of which 90% is routed through the Ras Lanuf terminal facilities. The Ras Lanuf oil terminal and port facilities offer oil repository and shipping services to Wintershall, OMV, OXY, Petro-Canada, and NOC.
The Chairman and the Management Committee of Harouge Oil Operations wishes to thank all those who contributed in this achievement of bringing the Naga field back to production.