Gulf Oil and Gas accountACCOUNT

Repair Efforts Continue at Rialto's Gazelle-P3 Well

Source: www.gulfoilandgas.com 4/2/2012, Location: Africa

Rialto Energy Limited, provides the following weekly update on drilling operations at the Gazelle-P3 Well as at 06:00hrs, 1 April 2012 (GMT). The Gazelle-P3 well was spudded on 12 March 2012 using the Transocean GSF Monitor jack-up drilling rig. The well is the first of an overall three well drilling programme on CI-202 that is anticipated to take six months to complete, together with testing. The well has been drilled to a depth of 1070m, at which point the drill-pipe became stuck. During the process of trying to free the drill-pipe, mechanical problems with the rig equipment occurred and are currently being rectified by the drilling contractor, Transocean. It is estimated that the repairs to the rig and the subsequent operations to remedy the stuck-pipe situation will take 2 weeks after which normal drilling operations will resume.

Commenting on the drilling progress, Charlie Nieto, Chief Operating Officer, said:

“We have experienced some delays during the beginning of our drilling programme but are working very closely with our drilling contractor, Transocean, to implement repairs and recommence drilling as soon as possible. We are very confident in our drilling team and once the rig equipment is repaired all efforts will be made to avoid further disruptions, and to ensure that the drilling is completed as efficiently and expediently as possible as we continue with our 3 well programme.”

Casing, Tubing & Drill Pipes >>

Casing, Tubing & Drill Pipes News in Ivory Coast (Cote D'Ivoire) >>

Mozambique >>  6/5/2019 - McDermott International, Inc. announced that CCS JV, a joint venture between McDermott, Saipem and Chiyoda, has reached full agreement for a contract ...
Nigeria >>  1/7/2019 - Penspen, a leading global provider of engineering and project management services to the energy industry, is pleased to announce that it has been awar...

Related Categories: Blowout Preventers Ram, Rotary, Spherical & Annular  Casing, Tubing & Drill Pipes  Coiled Tubing  Drill Bits and Cutters  Extraction Equipment  General  Handling Tools  Hoisting Systems  Lubricating Equipment 

Related Articles: Blowout Preventers Ram, Rotary, Spherical & Annular  Casing, Tubing & Drill Pipes  Coiled Tubing  Drill Bits and Cutters  Extraction Equipment  General  Handling Tools  Lubricating Equipment 


Ivory Coast (Cote D'Ivoire) Oil & Gas 1 >>  2 |

Oil & Gas Projects in Ivory Coast (Cote D'Ivoire) >>

More News

Related Links

AO BJ BW CD CG CI CM DZ EG EH ET GA GH GM GN GQ GW KE LR LY MA MG ML MR MZ NA NE NG RW SC SD SL SN SO ST SZ TD TN TZ UG ZA ZM
Gulf Oil and Gas
Copyright © Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.