DNO Provides Nabrajah # 8 Well Drilling Update

Source: www.gulfoilandgas.com 11/3/2005, Location: Middle East

DNO Annonced that Nabrajah # 8 in Block 43, Yemen has been drilled to a total depth of 3.065 meters. Wireline logs have been run and the well is now under preparations for an extensive production testing program. Nabrajah # 8 drilled ca. 950 meters of Basement. The objective of the production testing is to evaluate a number of zones of interest throughout the basement section identified from wireline logs and shows observed while drilling.

The participants in Block 43 are:

DNO 56.67 % (Operator)
Oil Search (Yemen) Limited 23.88 %
The Yemen Company 15 % (carried)


United Arab Emirates >>  4/19/2021 - Eni, through its subsidiary Eni RAK, has been awarded Block 7 located in the onshore of Ras Al Khaimah, United Arab Emirates. The Exploration and Prod...
Saudi Arabia >>  4/9/2021 - Aramco has signed a deal with a consortium led by EIG Global Energy Partners (“EIG”), one of the world’s leading energy infrastructure investors, to o...

Related Categories: Downhole Completion Equipment  Downhole Drilling Tools  Downhole Survey  Earth Resistivity Meters  General  Line Locators/Electro-Magnetic  Seismic Energy Sources  Seismographs  Sensors  Well Logging  Well Testing Equipment 

Related Articles: Downhole Completion Equipment  Downhole Drilling Tools  Downhole Survey  Earth Resistivity Meters  General  Line Locators/Electro-Magnetic  Seismic Energy Sources  Seismographs  Sensors  Well Logging  Well Testing Equipment 


Gulf Oil and Gas
Copyright © 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.