NIDC Drills 50 Wells

Source: Shana 7/11/2012, Location: Asia

National Iranian Drilling Company (NIDC) has managed to drill 50 oil and gas wells since the beginning of current Iranian calendar year on 20 March 2012.

Speaking to Shana, NIDC’s managing director, Haidar Bahmani, announced this adding out of the total figure, 27 wells were developmental while the remainders were workover wells.

He continued drilling operations were carried out in the areas covered by National Iranian South Oil Company (NISOC), Central Iranian Oil Fields Company (CIOFC) and other onshore and offshore projects.

Referring to naming current year as the Year of Supporting National Production, Supporting Iranian Labor and Capital, Bahmani said: NIDC’s workforce trying to speed up implementation of projects by doubling efforts.

According to Bahmani during the 110 days passing the beginning of the year, the number of drilled wells has raised by 10 in comparison to similar period last year.

‘We are ahead of schedule in implementation of drilling projects and will try to keep the pace during the coming months of the year’, Bahmani said.

Referring to possessing of 72 light, heavy and ultra heavy drilling rigs, NIDC’ managing director noted that the drilling fleet of the company was involved in drilling operations in seven provinces of the country along with offering technical and expertise services.

‘38 Fathe Drilling Rig joined NIDC’s fleet a few days ago and has started operations in area covered by National Iranian South Oil Company’, the official said.

Referring to fifth five year development plan and 20 Years Horizon targets, Bahmani said the role of drilling in oil industry was very important therefore providing and manufacturing of drilling rigs is one of the company’s priorities.

Bahmani noted that domestic research, academic and scientific centers in cooperation with Iranian manufacturers can play an important role in localization of the industry.

NIDC as a NIOC’s subsidiary in upstream sector is responsible for 90 percent of drilling operations plus providing technical and engineering services across the country.

During the last year the company managed to drill or complete 191 developmental, appraisal, exploratory and workover wells by drilling 454 thousand meter of oil and gas wells.


Norway >>  8/15/2022 - The Norwegian Petroleum Directorate (NPD) has granted PGNiG Norway Upstream AS drilling permit for well 6608/1-1 S, cf. Section 13 of the Resource Man...
Norway >>  8/12/2022 - Aker BP ASA, operator of production licence 941, has concluded the drilling of wildcat well 6507/3-15.

The well was drilled about 14 km nor...


Australia >>  8/9/2022 - Central Petroleum Limited (“Central”) advises that as at 0600 hrs ACST on 8 August 2022, the Palm Valley 12 (PV12) well in OL3, Southwest of Alice Spr...
Norway >>  8/9/2022 - The Petroleum Safety Authority Norway has given Equinor consent for exploration drilling in block 6507/8 in the Norwegian Sea.

Operator: E...


Guyana >>  8/5/2022 - The drilling of the Beebei-Potaro exploratory well, located in the Kanuku licence, off the coast of Guyana, has been finished, according to Tullow Oil...
Australia >>  8/4/2022 - - 21 stages were stimulated, which is the greatest number of stimulation stages in a single well in the Beetaloo to date
- Delivered 927m of st...


Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Gulf Oil and Gas
Copyright © 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.