Gulf Oil and Gas accountACCOUNT

M & P Provides Operational Updates on Omoueyi Permit

Source: www.gulfoilandgas.com 10/9/2012, Location: Africa

Production on the Omoueyi permit (Onal, Omko, Omgw, Ombg and Omoc-Nord fields) is 18,500 bopd after connecting the Omoc-N-700 platform wells.

Two additional platforms (PF 800 and PF 900) will be connected in the next few weeks. They replace PF 100 in which wells were shut down in late January 2012. The PF-200 platform will also be connected over the course of November. In total, eight new production wells and four injection wells will be brought into service by the end of November 2012, plus another two injector wells in December.

The efficiency of water injection has now been confirmed at the Omko field (Kissenda) and similar results are expected in the Omoc-Nord field when water injection is set up in December 2012. At the Omgw field (Basal Sands), the water injection begun in February 2012 is continuing and is stabilising pressure in the reservoir.

At the Onal field, the injection wells having caused early water breakthrough in some producers have been modified to combat this phenomenon. Water injection capacity will have doubled by the end of 2012, from 25,000 to 50,000 bpd, and additional pumps will be installed to increase injection pressure in the less permeable layers. These actions will produce a gradual increase in the quantity of oil output over the course of 2013.

Furthermore, laboratory studies conducted over more than a year have been able to finalise chemical formulas which will be implemented in the wells at the end of this year. They are designed to remedy the production drop observed after every workover in the wells and to improve the distribution of the water injected into the different reservoirs. These techniques should have a significant impact on the production of the wells from 2013 onwards and allow the original production targets to be achieved.

Production News in Gabon >>

Azerbaijan >>  10/18/2019 - In the third quarter of 2019, SOCAR increased oil production by 2.8% and natural gas production by 11.4% compared to the same period of the previous y...
United States >>  10/16/2019 - Diversified Gas & Oil PLC (DGOC) is pleased to report that it has extended its five-year definitive asset retirement agreement with the Commonwealth o...

Libya >>  10/11/2019 - Eng. Mustafa Sanalla, Chairman of National Oil Corporation (NOC), conducted a series of meetings in London to discuss recent oil and gas sector develo...
Russia >>  10/11/2019 - The Volgograd refinery (LUKOIL-Volgogradneftepererabotka, a wholly-owned subsidiary of PJSC LUKOIL) began production of low-sulfur fuel oil (BUNKER FU...

Iran >>  10/10/2019 - Iran plans to increase oil production in four oilfields shared with Iraq by nearly 60,000 barrels per day (bpd) until March 2020. ...
Russia >>  10/10/2019 - NOVATEK has announced that Arcticgas, a joint venture between NOVATEK and Gazprom Neft, commenced commercial production at the East-Urengoyskoye+North...

Related Categories: Camp Building  Cleaning Equipment, Services  Communication  Corrosion Products/Services  Development  Exploration  Food Supplies  General  Labor Services  Land & Leasing  Mine Clearance  Oil & Gas Companies  Production  Service Companies  Skilled Labors  Transportation, 4X4 Trucks  Unskilled Labors  Utility Systems  Waste Disposal  Water Supply Services  Welding Products/Services 

Related Articles: Camp Building  Cleaning Equipment, Services  Communication  Corrosion Products/Services  Development  Exploration  General  Labor Services  Land & Leasing  Mine Clearance  Oil & Gas Companies  Production  Service Companies  Skilled Labors  Transportation, 4X4 Trucks  Utility Systems  Water Supply Services  Welding Products/Services 


Gabon Oil & Gas 1 >>  2 | 3 | 4 |

Oil & Gas Projects in Gabon >>

More News

Related Links

Gulf Oil and Gas
Copyright 2019 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.